Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Clemson
Work includes 16,291 SF asphalt mill and resurface; 14,094 SF asphalt demolition; 1,754 LF curb and gutter demolition; 15,750 SF brick paver demolition; 17,900 SF concrete sidewalk; 8,635 SF heavy duty concrete pavement; 2,181 SF concrete stamping; 1,448 LF 18" concrete curb and gutter; 2 EA. ADA ramp; 495 LF thermoplastic striping (double striping); 150 LF electrical conduit; 1,169 LF fiber conduit; 8 EA. catenary lighting mount; 8 LF handrail; 435 LF 15" HP storm pipe; 140 LF 6" DIP waterline.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
West View Borough Municipal Authority
Provide streetscape improvements. Removal of existing brick pavers; coordination with utilities; grading; installation of new and decorative concrete walkways; ADA ramps and routes; drainage structures; and restoration.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
West View Borough Municipal Authority
Close: Dec 18, 2025
Provide streetscape improvements. Removal of existing brick pavers; coordination with utilities; grading; installation of new and decorative concrete walkways; ADA ramps and routes; drainage structures; and restoration.
AvailableCity of Independence
Brecksville road streetscape improvements.
Posted Date
Nov 13, 2025
Due Date
Dec 19, 2025
Release: Nov 13, 2025
City of Independence
Close: Dec 19, 2025
Brecksville road streetscape improvements.
AvailableColumbus And Franklin County Metropolitan Park District
Park - site improvements phase 1.
Posted Date
-
Due Date
Nov 20, 2025
Columbus And Franklin County Metropolitan Park District
Close: Nov 20, 2025
Park - site improvements phase 1.
AvailableCity of Morganton
Project consists of streetscape improvements from the intersection of n. Green street and e. Union street to the intersection of n. Green street and fleming place and along avery avenue from the intersection of n green street and n sterling street. Work includes but is not limited to removal of existing asphalt, concrete, curbing, water line and sewer line improvements, storm drainage, the installation of concrete sidewalk, concrete curbing, brick walls, pavers, site furnishings, landscaping, street lighting, mast arm poles, electrical, signage, and asphalt paving.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
City of Morganton
Close: Dec 9, 2025
Project consists of streetscape improvements from the intersection of n. Green street and e. Union street to the intersection of n. Green street and fleming place and along avery avenue from the intersection of n green street and n sterling street. Work includes but is not limited to removal of existing asphalt, concrete, curbing, water line and sewer line improvements, storm drainage, the installation of concrete sidewalk, concrete curbing, brick walls, pavers, site furnishings, landscaping, street lighting, mast arm poles, electrical, signage, and asphalt paving.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis