Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Chaska
Base Bid - Alternate 1 •8” C900 PVC Watermain (Open Cut) 420 LF; •8” C900 PVC Watermain (Pipe Burst) 940 LF; •Concrete Curb & Gutter 140 LF; •Bituminous Street Patch 1,000 SY; Base Bid - Alternate 2; •8” C900 PVC Watermain (Open Cut) 370 LF; •8” C900 PVC Watermain (Pipe Burst) 990 LF; •Concrete Curb & Gutter 220 LF; •Bituminous Street Patch 900 SY.
Posted Date
Jul 2, 2026
Due Date
Jul 15, 2026
Release: Jul 2, 2026
City of Chaska
Close: Jul 15, 2026
Base Bid - Alternate 1 •8” C900 PVC Watermain (Open Cut) 420 LF; •8” C900 PVC Watermain (Pipe Burst) 940 LF; •Concrete Curb & Gutter 140 LF; •Bituminous Street Patch 1,000 SY; Base Bid - Alternate 2; •8” C900 PVC Watermain (Open Cut) 370 LF; •8” C900 PVC Watermain (Pipe Burst) 990 LF; •Concrete Curb & Gutter 220 LF; •Bituminous Street Patch 900 SY.
AvailableCity of Chaska
Construction of storm sewer improvements and street construction with approximately the following quantities: •1940 LF of Sanitary Sewer Pipe (HDD & Open Cut) •10 EA 48” Dia. Sanitary Manholes •175 LF of Sanitary Sewer Manhole Lining •1.35 Acres of Restoration •120 LF Storm Sewer •400 SY Bituminous Paving •.75 Acres of Clear & grub Along with traffic control, miscellaneous removals, erosion control, restoration, guard rail replacement and correlated appurtenances.
Posted Date
May 20, 2026
Due Date
Jun 25, 2026
Release: May 20, 2026
City of Chaska
Close: Jun 25, 2026
Construction of storm sewer improvements and street construction with approximately the following quantities: •1940 LF of Sanitary Sewer Pipe (HDD & Open Cut) •10 EA 48” Dia. Sanitary Manholes •175 LF of Sanitary Sewer Manhole Lining •1.35 Acres of Restoration •120 LF Storm Sewer •400 SY Bituminous Paving •.75 Acres of Clear & grub Along with traffic control, miscellaneous removals, erosion control, restoration, guard rail replacement and correlated appurtenances.
City of Chaska
Demolition of the existing plaza and parking lot areas, and construction of a new plaza area that consists of concrete and paver walks, hydronic heating system, parking lot improvements, pedestrian and parking lot lighting, landscaping, site furnishings, retaining walls, and restoration, generally consisting of the following quantities: 1,000 LF of 6” PVC Draintile, 1,200 TN of Aggregate Base 5,500 SF of Concrete Walk, 10,700 SF of Heated Concrete Walk, 6,700 SF of Heated Clay Pavers, 400 TN of Bituminous Course Mixtures, 850 LF of Concrete Curb and Gutter, Gas Boilers and Mechanical Room Construction, EA of Condensing Unit Installation/Relocation, Monument Sign and Foundation, Masonry Columns and Rail Assemblies, Masonry Seat Wall and Retaining Walls, Shade Structure, Tables, and Other Site Furnishings, Parking Lot and Plaza Lighting, Accessory and Site Improvements, Conduit and Electrical, Trees and Shrub Plantings, Irrigation.
Posted Date
May 20, 2026
Due Date
Jun 11, 2026
Release: May 20, 2026
City of Chaska
Close: Jun 11, 2026
Demolition of the existing plaza and parking lot areas, and construction of a new plaza area that consists of concrete and paver walks, hydronic heating system, parking lot improvements, pedestrian and parking lot lighting, landscaping, site furnishings, retaining walls, and restoration, generally consisting of the following quantities: 1,000 LF of 6” PVC Draintile, 1,200 TN of Aggregate Base 5,500 SF of Concrete Walk, 10,700 SF of Heated Concrete Walk, 6,700 SF of Heated Clay Pavers, 400 TN of Bituminous Course Mixtures, 850 LF of Concrete Curb and Gutter, Gas Boilers and Mechanical Room Construction, EA of Condensing Unit Installation/Relocation, Monument Sign and Foundation, Masonry Columns and Rail Assemblies, Masonry Seat Wall and Retaining Walls, Shade Structure, Tables, and Other Site Furnishings, Parking Lot and Plaza Lighting, Accessory and Site Improvements, Conduit and Electrical, Trees and Shrub Plantings, Irrigation.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; if requested, redirect to coops or a standard competitive process.
Coops: Lead with Sourcewell or Minnesota CPV to piggyback a pre-competed contract.
Entity: City of Chaska, MN.
Flexibility: Limited to no sole source; no evidence of sole source awards above the competitive bidding threshold.
Board meetings and strategic plans from City of Chaska
The council meeting focused on the appointment of four community members to the Library Task Force to provide input for the new library design. The agenda also included the approval of consent items and payment of bills. Other notable discussions involved updates on various upcoming city events, including the Fire and Ice celebration, Night to You Night, and River City Days, as well as positive reports on the farmers market and the new Copperfield venue. Additionally, the council discussed the upcoming Bavaria Road resurfacing project and acknowledged the recent KPMG Women's PGA Championship.
The meeting featured a presentation on domestic violence prevention education from Maria's Voice. The discussion covered the organization's public health model, which includes awareness, education, and safe action strategies modeled after CDC best practices. Key initiatives discussed were the redesign of educational materials for better accessibility, the development of teen and men's programs, and community outreach through various partnerships and resource distribution.
The council meeting addressed several agenda items, including the adoption of an amended agenda and visitor presentations. The council approved the appointment of members to the Downtown Master Plan Task Force, following a selection process from several applicants. Additionally, a public hearing was held regarding assessments for the 2026 downtown street reconstruction project, which includes the replacement of the Third Street bridge and various utility improvements. Discussions also touched upon the progress of the building improvement program, including the fast-tracked city hall plaza project.
The commission reviewed the preliminary site and building plans, preliminary plat, rezoning request, and comprehensive plan amendment for the Big Woods Business Park North, Phase 1, which includes a proposed distribution center. Key topics discussed included traffic impact assessments, proposed utility extensions across the local ravine, infrastructure improvements including new roundabouts and access points in coordination with Carver County, and the incorporation of landscaping and green belt preservation strategies. The commission also reviewed architectural standards, outdoor employee gathering spaces, and the necessary wetland mitigation plan associated with the project.
The meeting featured a presentation from the founder of the nonprofit organization Slam the Stigma, which focuses on youth mental health, building community for high school students, and providing resources to eliminate barriers to care. Additionally, the commission reviewed the treasurer's report, which included updates on budget allocations and expenses related to the upcoming Pride event.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Chaska's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Administrative Services Director (responsible for Finance, Information Services, and Utility Billing)
Premium
Access the largest public sector contact database
© 2026 Starbridge