Discover Opportunities months before the RFP drops
Learn more →Design-build turnkey replacement of the failed VRF system with residential DX split HVAC systems for Bryan Fire Station No. 2, including full design, installation of ~35–40 tons capacity (multiple split systems), gas-fired furnaces, two DOAS units, new outdoor condensing units and refrigerant line sets, soft-start kits, upgraded media filters, remote monitoring, and related demolition/repairs. Equipment must be industry-standard/non‑proprietary (e.g., Carrier, Daikin, Mitsubishi), local-serviceable, code-compliant; work to accommodate an occupied 24/7 fire station. Estimated budget $600,000–$800,000.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Design-build turnkey replacement of the failed VRF system with residential DX split HVAC systems for Bryan Fire Station No. 2, including full design, installation of ~35–40 tons capacity (multiple split systems), gas-fired furnaces, two DOAS units, new outdoor condensing units and refrigerant line sets, soft-start kits, upgraded media filters, remote monitoring, and related demolition/repairs. Equipment must be industry-standard/non‑proprietary (e.g., Carrier, Daikin, Mitsubishi), local-serviceable, code-compliant; work to accommodate an occupied 24/7 fire station. Estimated budget $600,000–$800,000.
AvailableProvide design and build services for the replacement of existing HVAC system for city fire station no. 2.
Posted Date
Nov 21, 2025
Due Date
Dec 18, 2025
Release: Nov 21, 2025
Close: Dec 18, 2025
Provide design and build services for the replacement of existing HVAC system for city fire station no. 2.
AvailableThe City of Bryan is requesting qualifications for the Waco Street Reconstruction Phases 2 and 3 to provide engineering services for design and construction-phase support including widening, drainage, and utility upgrades. The selected firm(s) will prepare coordinated plan sets and right-of-way acquisition exhibits and support construction-phase services; the project budget is estimated in the $1,000,000–$5,000,000 range for selected firm services.
Posted Date
Nov 12, 2025
Due Date
Dec 2, 2025
Release: Nov 12, 2025
Close: Dec 2, 2025
The City of Bryan is requesting qualifications for the Waco Street Reconstruction Phases 2 and 3 to provide engineering services for design and construction-phase support including widening, drainage, and utility upgrades. The selected firm(s) will prepare coordinated plan sets and right-of-way acquisition exhibits and support construction-phase services; the project budget is estimated in the $1,000,000–$5,000,000 range for selected firm services.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis