Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Champions Municipal Utility District
Provide construction of water and sanitary line replacement. Installation 8-inch AWWA C-900 water line, by trenchless construction, for all depths, including restrained joints, bends, fittings, open right gate valves with boxes, and Mueller, or approved equal, fire hydrant assemblies. Disinfection and hydrostatic testing shall be completed by the Contractor. Installation of minimum 14-inch steel casing, by trenchless construction, including fittings. Contractor shall make sure proposed water line with restrained joints and spacers has the needed clearance for installation inside the proposed steel casing. Connection of the new water lines to the existing water system by full-body tee wet connections. Installation and connection of new service leads from the new water line to the relocated water meters using stainless steel tapping saddle or sleeve including Ford or Mueller corporation valves and ball valve curb stops, or approved equal. No 90-degree curb stops will be allowed. It will be the Contractor’s responsibility to ensure that all meters are reconnected to the new water line.
Posted Date
-
Due Date
Apr 14, 2026
Champions Municipal Utility District
Close: Apr 14, 2026
Provide construction of water and sanitary line replacement. Installation 8-inch AWWA C-900 water line, by trenchless construction, for all depths, including restrained joints, bends, fittings, open right gate valves with boxes, and Mueller, or approved equal, fire hydrant assemblies. Disinfection and hydrostatic testing shall be completed by the Contractor. Installation of minimum 14-inch steel casing, by trenchless construction, including fittings. Contractor shall make sure proposed water line with restrained joints and spacers has the needed clearance for installation inside the proposed steel casing. Connection of the new water lines to the existing water system by full-body tee wet connections. Installation and connection of new service leads from the new water line to the relocated water meters using stainless steel tapping saddle or sleeve including Ford or Mueller corporation valves and ball valve curb stops, or approved equal. No 90-degree curb stops will be allowed. It will be the Contractor’s responsibility to ensure that all meters are reconnected to the new water line.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Champions Municipal Utility District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database