Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Cerebral Palsy League
Modify existing asphalt paved area to install new owner supplied bus shelter concrete pad. Provide and install new concrete pad. Install new owner supplied bus shelter. Provide and install new bollards.
Posted Date
Mar 9, 2026
Due Date
Mar 25, 2026
Release: Mar 9, 2026
Cerebral Palsy League
Close: Mar 25, 2026
Modify existing asphalt paved area to install new owner supplied bus shelter concrete pad. Provide and install new concrete pad. Install new owner supplied bus shelter. Provide and install new bollards.
AvailableCerebral Palsy League
Work includes : modify existing framed partition to an existing space to create vision panels for nursing observation purposes. Minor relocation of existing electrical receptacles, switches and data ports will be required. Install a new counter with base/wall cabinetry, sink and faucet to replace existing in two locations. Modify existing adjacent walls as required to install new systems.
Posted Date
May 1, 2025
Due Date
May 21, 2025
Release: May 1, 2025
Cerebral Palsy League
Close: May 21, 2025
Work includes : modify existing framed partition to an existing space to create vision panels for nursing observation purposes. Minor relocation of existing electrical receptacles, switches and data ports will be required. Install a new counter with base/wall cabinetry, sink and faucet to replace existing in two locations. Modify existing adjacent walls as required to install new systems.
Cerebral Palsy League
Install new framed half-walls to partition an existing space to create a water closet cubicle. Cut the existing concrete slab floor to install new water closet plumbing tied to the existing adjacent bathroom. Install a new counter with base cabinetry and sink. Provide new faucet and extend plumbing from existing sink to new location. Modify existing adjacent walls as required to install new systems. Existing wall finish renovations. Minor electrical work is included.
Posted Date
Feb 7, 2025
Due Date
Feb 24, 2025
Release: Feb 7, 2025
Cerebral Palsy League
Close: Feb 24, 2025
Install new framed half-walls to partition an existing space to create a water closet cubicle. Cut the existing concrete slab floor to install new water closet plumbing tied to the existing adjacent bathroom. Install a new counter with base cabinetry and sink. Provide new faucet and extend plumbing from existing sink to new location. Modify existing adjacent walls as required to install new systems. Existing wall finish renovations. Minor electrical work is included.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Cerebral Palsy League's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database