Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Center Township Sewer Authority
Lift station forcemain and gravity sewer improvements.
Posted Date
Jun 16, 2026
Due Date
Jul 27, 2026
Release: Jun 16, 2026
Center Township Sewer Authority
Close: Jul 27, 2026
Lift station forcemain and gravity sewer improvements.
AvailableCenter Township Sewer Authority
Work includes approx. Contract No. 26-S2 - open-cut in-trench replacement of approximately 240 LF of interceptor; dye testing; cleaning and closed circuit televising (CCTV); manhole replacement/abandonment; forcemain relocation; forcemain bypass and air release valve vault; core and connection to the New College Lift Station; slide gate removal and new slide gate valve vault; connection to existing facilities; pressure testing; pre and post construction and township roadway restoration. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents. Work included under Contract No. 26-S3 - includes the open-cut in-trench replacement of approximately 1,425 LF of interceptor; manhole replacement/abandonment; installation of manhole orifice plate; connection to existing facilities; and any and all required restoration. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents.
Posted Date
Jan 27, 2026
Due Date
Mar 24, 2026
Release: Jan 27, 2026
Center Township Sewer Authority
Close: Mar 24, 2026
Work includes approx. Contract No. 26-S2 - open-cut in-trench replacement of approximately 240 LF of interceptor; dye testing; cleaning and closed circuit televising (CCTV); manhole replacement/abandonment; forcemain relocation; forcemain bypass and air release valve vault; core and connection to the New College Lift Station; slide gate removal and new slide gate valve vault; connection to existing facilities; pressure testing; pre and post construction and township roadway restoration. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents. Work included under Contract No. 26-S3 - includes the open-cut in-trench replacement of approximately 1,425 LF of interceptor; manhole replacement/abandonment; installation of manhole orifice plate; connection to existing facilities; and any and all required restoration. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Center Township Sewer Authority
The board discussed and took action on several key items including the approval of a partial payment for the Elkhorn Run STP Final Clarifier Rehabilitation project and the acceptance of a developer's agreement with Bridgewater Crossing 2, LLC for the Valley Village Townhomes. Additionally, the board approved the 2025 financial statements and independent auditor's report, and authorized the payment of various capital project fund requisitions covering engineering services and general maintenance expenses.
The board discussed various infrastructure projects, including sewage treatment plant rehabilitation, lift station improvements, interceptor upgrades, and sanitary sewer lining. Funding applications for multiple fiscal years were reviewed alongside development projects involving private and public sewer lines. Additionally, operational reports addressed equipment repair status for a lift station, and old business included a pending notification regarding excessive infiltration and inflow within a commercial sanitary sewer system.
The board approved a partial payment for the Elkhorn Run STP Final Clarifier Rehabilitation project and reviewed various ongoing construction projects, funding applications, and housing developments. The Operations Supervisor provided updates on the SCADA installation project and the ongoing digitization of sewer mapping. Additionally, the board approved multiple Capital Project Fund requisitions, including payments for engineering services, construction work, and road repairs.
The board meeting addressed various operational and financial matters, including the approval of the financial statement and ratification of bills. Key discussion points featured an engineer's report highlighting the approval of Change Order No. 1 for the Elkhorn Run STP Final Clarifier Rehabilitation, along with updates on ongoing construction projects, funding applications, and development progress. The board also reviewed and approved Capital Project Fund Requisition #4-2026 for various engineering services and received updates from the Operations Supervisor regarding Scada installation and upcoming meetings concerning the Logstown Lift Station.
The work session included reports from the engineer, solicitor, and operations supervisor. The engineer's report covered various construction projects such as clarifier rehabilitation, lift station improvements, and sewer upgrades, as well as ongoing funding applications and updates on several residential development projects. The operations supervisor highlighted upcoming annual lab training requirements for personnel. Additionally, the status of a letter regarding sewer infiltration issues at the local mall was discussed as an old business item.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Center Township Sewer Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge