Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Calvert Country School
Work includes 100 CY remove and replace unsuitable pavement subgrade material and replace with graded aggregate base (gab) compacted in accordance with specs; 260 SF remove and dispose of existing concrete sidewalk and any unsuitable subbase. Replace with concrete sidewalk per contract plans and specs; 20 LF remove and dispose of existing concrete curb or concrete curb and gutter and any unsuitable subbase. Replace with concrete curb and gutter per contract plans and specs; 300 SF provide and install woven fabric (mirafi 500x) or approved equal for subgrade stabilization; 20 SY full depth patch in accordance with MSHA standard spec section 505 including sawcut and remove existing pavement and replacement with full depth section consisting of 1.5" HMA surface (9.5mm), 3.0" HMA base (19.0mm) and 6" gab.
Posted Date
Mar 13, 2026
Due Date
Apr 15, 2026
Release: Mar 13, 2026
Calvert Country School
Close: Apr 15, 2026
Work includes 100 CY remove and replace unsuitable pavement subgrade material and replace with graded aggregate base (gab) compacted in accordance with specs; 260 SF remove and dispose of existing concrete sidewalk and any unsuitable subbase. Replace with concrete sidewalk per contract plans and specs; 20 LF remove and dispose of existing concrete curb or concrete curb and gutter and any unsuitable subbase. Replace with concrete curb and gutter per contract plans and specs; 300 SF provide and install woven fabric (mirafi 500x) or approved equal for subgrade stabilization; 20 SY full depth patch in accordance with MSHA standard spec section 505 including sawcut and remove existing pavement and replacement with full depth section consisting of 1.5" HMA surface (9.5mm), 3.0" HMA base (19.0mm) and 6" gab.
AvailableCalvert Country School
Provide consultant to conduct a comprehensive operating assessment and efficiency review of selected operational departments.
Posted Date
Sep 22, 2025
Due Date
Oct 21, 2025
Release: Sep 22, 2025
Calvert Country School
Close: Oct 21, 2025
Provide consultant to conduct a comprehensive operating assessment and efficiency review of selected operational departments.
Calvert Country School
Provide marketing and publication design for career & technical education programs.
Posted Date
Sep 5, 2025
Due Date
Oct 3, 2025
Release: Sep 5, 2025
Calvert Country School
Close: Oct 3, 2025
Provide marketing and publication design for career & technical education programs.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Use only if the need is truly unique; co-author a robust justification with the program owner and route through Finance for Board approval.
Coops: Lead with MEEC or Sourcewell to purchase quickly via piggybacking; align with the requesting department to champion the buy.
Calvert County Public School District, MD faces heightened scrutiny on sole-source due to a recent OIGE investigation. No specific sole-source dollar threshold is stated.
Practical steps:
Track Calvert Country School's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database