Learn more →Work includes approx, 947 LF 36" rcp class 3 storm sewer pipe; 87 LF 24" white stripping sddot detail 633. 10; 512 LF 8" dia gravity sewer pipe; 40 LF 12" watermain; 493 LF 18" arch class storm sewer pipe. 1 ls mobilization; 1 ls traffic control; 16 hr sweeping; 1920 CY imported supplemental topsoil (6"); 23 ea inlet protection; 7240 LF erosion control wattles; 11 ea temporary vehicle construction entrance; 4 EA concrete washout area; 4 EA manhole construction plate marker; 2.4 acre hydro-mulching, seeding, fertilizing; 960 SF turf reinforcement mat; 17 ea clear and grub tree; 20 LF remove and reset fence; 26 ea remove and reset traffic sign and post; 13659 SY remove bituminous surfacing; 1687 LF remove concrete curb and gutter. 319 SY Remove Concrete Pavement. See attached file.
Posted Date
May 15, 2025
Due Date
May 27, 2025
Release: May 15, 2025
Close: May 27, 2025
Work includes approx, 947 LF 36" rcp class 3 storm sewer pipe; 87 LF 24" white stripping sddot detail 633. 10; 512 LF 8" dia gravity sewer pipe; 40 LF 12" watermain; 493 LF 18" arch class storm sewer pipe. 1 ls mobilization; 1 ls traffic control; 16 hr sweeping; 1920 CY imported supplemental topsoil (6"); 23 ea inlet protection; 7240 LF erosion control wattles; 11 ea temporary vehicle construction entrance; 4 EA concrete washout area; 4 EA manhole construction plate marker; 2.4 acre hydro-mulching, seeding, fertilizing; 960 SF turf reinforcement mat; 17 ea clear and grub tree; 20 LF remove and reset fence; 26 ea remove and reset traffic sign and post; 13659 SY remove bituminous surfacing; 1687 LF remove concrete curb and gutter. 319 SY Remove Concrete Pavement. See attached file.
Remove in-place 100.5 foot long two-span precast prestressed concrete double tee structure and install new two-span steel girder structure. Work includes earthwork, roadway grading, and installation of steel girder structure.
Posted Date
Jul 19, 2024
Due Date
Aug 7, 2024
Release: Jul 19, 2024
Close: Aug 7, 2024
Remove in-place 100.5 foot long two-span precast prestressed concrete double tee structure and install new two-span steel girder structure. Work includes earthwork, roadway grading, and installation of steel girder structure.
Remove in-place 55.5 FT long two-span steel I-beam with a steel deck structure, install new 4-13’x8’ cast-in-place concrete box culvert structure. Work includes earthwork, roadway grading, and installation of cast-in-place concrete box culvert.
Posted Date
Jul 19, 2024
Due Date
Aug 7, 2024
Release: Jul 19, 2024
Close: Aug 7, 2024
Remove in-place 55.5 FT long two-span steel I-beam with a steel deck structure, install new 4-13’x8’ cast-in-place concrete box culvert structure. Work includes earthwork, roadway grading, and installation of cast-in-place concrete box culvert.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis