Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove in-place 55.5 FT long two-span steel I-beam with a steel deck structure, install new 4-13’x8’ cast-in-place concrete box culvert structure. Work includes earthwork, roadway grading, and installation of cast-in-place concrete box culvert.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal of structure, box culvert, grading, and incidentals, 0.160 miles. Work include, 4,034 CY, Borrow-excavation. 3,218 LF, FIBER ROLLS 12IN. 900 Acre, Wetland Mitigation Site 1.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Removal of structure, box culvert, grading, and incidentals, 0.160 miles. Work include, 4,034 CY, Borrow-excavation. 3,218 LF, FIBER ROLLS 12IN. 900 Acre, Wetland Mitigation Site 1.
Premium
Access the largest public sector contact database
Work includes removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
Posted Date
Nov 4, 2025
Due Date
Jan 13, 2026
Release: Nov 4, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, curb and gutter, beam guard, erosion control, permanent signing, traffic control, pavement marking, restoration.
AvailableStructure Replacement, Grading & Incidentals, 0.170 miles, work includes, 5,080 CY, Common excavation-type A. 2,437 CY, Riprap grade II. 16.100 TN, Aggregate base course cl 5. 44,548 LBS, Reinforcing steel-grade 60. 40,165 LBS, Reinforcing steel-grade 60-epoxy coated.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Structure Replacement, Grading & Incidentals, 0.170 miles, work includes, 5,080 CY, Common excavation-type A. 2,437 CY, Riprap grade II. 16.100 TN, Aggregate base course cl 5. 44,548 LBS, Reinforcing steel-grade 60. 40,165 LBS, Reinforcing steel-grade 60-epoxy coated.
Structure removals & replacement, grading, incidentals, 0.100 miles. Work includes, 2,300 Acre Straw mulch. 646 SY, ECB TYPE 2. 2,063 LF, Fiber rolls 12in. 1,940 LF, Fence Barbed Wire 4 Strand-steel Post. See attached file.
Posted Date
Nov 17, 2025
Due Date
Dec 12, 2025
Release: Nov 17, 2025
Close: Dec 12, 2025
Structure removals & replacement, grading, incidentals, 0.100 miles. Work includes, 2,300 Acre Straw mulch. 646 SY, ECB TYPE 2. 2,063 LF, Fiber rolls 12in. 1,940 LF, Fence Barbed Wire 4 Strand-steel Post. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis