Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx, 947 LF 36" rcp class 3 storm sewer pipe; 87 LF 24" white stripping sddot detail 633. 10; 512 LF 8" dia gravity sewer pipe; 40 LF 12" watermain; 493 LF 18" arch class storm sewer pipe. 1 ls mobilization; 1 ls traffic control; 16 hr sweeping; 1920 CY imported supplemental topsoil (6"); 23 ea inlet protection; 7240 LF erosion control wattles; 11 ea temporary vehicle construction entrance; 4 EA concrete washout area; 4 EA manhole construction plate marker; 2.4 acre hydro-mulching, seeding, fertilizing; 960 SF turf reinforcement mat; 17 ea clear and grub tree; 20 LF remove and reset fence; 26 ea remove and reset traffic sign and post; 13659 SY remove bituminous surfacing; 1687 LF remove concrete curb and gutter. 319 SY Remove Concrete Pavement. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bids requested for the construction of 205th Avenue Improvements, encompassing excavation, paving, culvert installation, fencing, striping, signing, and segmental retaining wall construction.
Posted Date
-
Due Date
Dec 19, 2025
Release: -
Close: Dec 19, 2025
Bids requested for the construction of 205th Avenue Improvements, encompassing excavation, paving, culvert installation, fencing, striping, signing, and segmental retaining wall construction.
AvailableWork includes dewatering and flow diversion, clearing and grubbing, prevention, control and abatement of erosion and water, 1000 SY type b stabilization (12") (lbr=40), 855 SY recycled concrete road base (10"), 920 SY milling of existing asphalt pavement (1-1/2" average depth), 1770 SY superpave asphalt concrete (2-1/2"), 1 ea ditch bottom inlet (type "v"), 213 LF concrete pipe culvert (18" rcp, class iii), 30 LF precast concrete trench drain type ii, 90 SY concrete sidewalk (4" thick), 190 LF chain link fence (6' high) (88 ft removal / 72 FT replacement). See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work includes dewatering and flow diversion, clearing and grubbing, prevention, control and abatement of erosion and water, 1000 SY type b stabilization (12") (lbr=40), 855 SY recycled concrete road base (10"), 920 SY milling of existing asphalt pavement (1-1/2" average depth), 1770 SY superpave asphalt concrete (2-1/2"), 1 ea ditch bottom inlet (type "v"), 213 LF concrete pipe culvert (18" rcp, class iii), 30 LF precast concrete trench drain type ii, 90 SY concrete sidewalk (4" thick), 190 LF chain link fence (6' high) (88 ft removal / 72 FT replacement). See attached file.
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Close: Jan 6, 2026
The work includes milling and paving, HMA profile milling, full depth pavement repair, upgrading bicycle safe grates/eco curb pieces, drainage improvements, as well as other improvements depicted within the Construction Plans. Alternate Bid ‘A' consists of installation of 24” precast polymer concrete trench drain at the intersection of Studio Road and Day Avenue.
Posted Date
Dec 11, 2025
Due Date
Jan 8, 2026
Release: Dec 11, 2025
Close: Jan 8, 2026
The work includes milling and paving, HMA profile milling, full depth pavement repair, upgrading bicycle safe grates/eco curb pieces, drainage improvements, as well as other improvements depicted within the Construction Plans. Alternate Bid ‘A' consists of installation of 24” precast polymer concrete trench drain at the intersection of Studio Road and Day Avenue.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.