Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Brazoria County MUD No. 88
Work includes construction of water, sewer and drainage facilities to serve maple view section 1. 10 CY extra excavation (hand labor); 10 TN extra cement stabilized sand (bedding or backfill) for sanitary sewer and storm sewer; 1-1/2 sacks/ton; 10 CY extra compacted select backfill; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; polyvinyl chloride (sdr-26) pipe, all depths standard village of bonney wet-sand bedding and backfill; complete in place. See attached file.
Posted Date
-
Due Date
May 27, 2026
Brazoria County MUD No. 88
Close: May 27, 2026
Work includes construction of water, sewer and drainage facilities to serve maple view section 1. 10 CY extra excavation (hand labor); 10 TN extra cement stabilized sand (bedding or backfill) for sanitary sewer and storm sewer; 1-1/2 sacks/ton; 10 CY extra compacted select backfill; 100 CY crushed stone in trench bottom for pipe bedding in wet sand areas, including compaction, complete in place; polyvinyl chloride (sdr-26) pipe, all depths standard village of bonney wet-sand bedding and backfill; complete in place. See attached file.
AvailableBrazoria County MUD No. 88
Construction of paving improvements.
Posted Date
Jun 23, 2025
Due Date
Jul 9, 2025
Release: Jun 23, 2025
Brazoria County MUD No. 88
Close: Jul 9, 2025
Construction of paving improvements.
Brazoria County MUD No. 88
Work include 10 cy Excavation; 2,655 lf 8" Polyvinyl chloride (SDR-26) pipe; 30 LF bore & jack 16" Steel Casing w/ 8" PVC; 3,940 LF Forcemain 8" open cut; 30 LF 16 inch Steel Casing w/ 8 inch Forcemain; 3.305 LF 8" jack & bore; 530 LF 16" steel casing w/8" forcemain. 4,290 lf Well points for dewatering; See outside link for more.
Posted Date
May 13, 2025
Due Date
Jun 20, 2025
Release: May 13, 2025
Brazoria County MUD No. 88
Close: Jun 20, 2025
Work include 10 cy Excavation; 2,655 lf 8" Polyvinyl chloride (SDR-26) pipe; 30 LF bore & jack 16" Steel Casing w/ 8" PVC; 3,940 LF Forcemain 8" open cut; 30 LF 16 inch Steel Casing w/ 8 inch Forcemain; 3.305 LF 8" jack & bore; 530 LF 16" steel casing w/8" forcemain. 4,290 lf Well points for dewatering; See outside link for more.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge