Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Brazoria County MUD No. 82
Work includes detention ponds for ashland phase 2 detention & mass grading.
Posted Date
Jul 10, 2026
Due Date
Jul 24, 2026
Release: Jul 10, 2026
Brazoria County MUD No. 82
Close: Jul 24, 2026
Work includes detention ponds for ashland phase 2 detention & mass grading.
AvailableBrazoria County MUD No. 82
Scope of work of the contract includes water, sanitary, drainage & paving facilities includes 3,097 LF 8" C-900 AWWA (DR18) class 150 waterline (including valves, fittings, bedding, backfill and testing) complete in place, 1,792 LF 8" sanitary sewer pipe, 0-10 foot depth, (including air testing, mandrel testing, cement stabilized sand bedding and backfill), complete in place, 18 EA sanitary sewer manhole, standard depth, complete in place, 30 EA Single or double near side 6" sanitary sewer leads (including wye and plugs), complete in place, 1,227 LF 24" HP Storm Pipe, ASTM F2881 or AASHTO M330, all depths, (including bedding and backfill), complete in place, 6,293 LF 24" HP Storm Pipe, ASTM F2881 or AASHTO M330, all depths, (including bedding and backfill), complete in place, 2,602 LF Trench safety system for 24" and greater pipe, all depths, 8,895 LF Well point system, complete in place and operated per specifications, 1,000 LF Wet sand construction for sanitary sewer & storm sewer.
Posted Date
Jan 16, 2026
Due Date
Jan 30, 2026
Release: Jan 16, 2026
Brazoria County MUD No. 82
Close: Jan 30, 2026
Scope of work of the contract includes water, sanitary, drainage & paving facilities includes 3,097 LF 8" C-900 AWWA (DR18) class 150 waterline (including valves, fittings, bedding, backfill and testing) complete in place, 1,792 LF 8" sanitary sewer pipe, 0-10 foot depth, (including air testing, mandrel testing, cement stabilized sand bedding and backfill), complete in place, 18 EA sanitary sewer manhole, standard depth, complete in place, 30 EA Single or double near side 6" sanitary sewer leads (including wye and plugs), complete in place, 1,227 LF 24" HP Storm Pipe, ASTM F2881 or AASHTO M330, all depths, (including bedding and backfill), complete in place, 6,293 LF 24" HP Storm Pipe, ASTM F2881 or AASHTO M330, all depths, (including bedding and backfill), complete in place, 2,602 LF Trench safety system for 24" and greater pipe, all depths, 8,895 LF Well point system, complete in place and operated per specifications, 1,000 LF Wet sand construction for sanitary sewer & storm sewer.
Brazoria County MUD No. 82
Work includes construction of water, sanitary, drainage & paving facilities.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Brazoria County MUD No. 82
Close: Jan 22, 2026
Work includes construction of water, sanitary, drainage & paving facilities.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge