Discover Opportunities months before the RFP drops
Learn more →Cordova Hills Town Center Village Phase 1A Improvements.
Posted Date
May 2, 2025
Due Date
Dec 11, 2025
Release: May 2, 2025
Close: Dec 11, 2025
Cordova Hills Town Center Village Phase 1A Improvements.
Work induces phase 1 offsite water improvement: 310 LF 12" dip class 350; 57 LF 16" dip class 350; 165 LF 20" dip class 350; 215 LF 24" dip class 350; 1 EA 6" blow off valve; 2 ea butterfly valves; traffic control and erosion control: 1 LS erosion control (protection of work); pavement improvements: 61,350 SF 4" ac /4" ab (with cut off curbs and rip-rap); 61,350 SF access road grading; 1 LS raise iron, bollards, signage; 468 SF concrete section of access road; 33 LF 24" sanitite hp pipe; 30 LF 30" sanitite hp pipe; 1 EA drop inlet, type f. See outside link.
Posted Date
Mar 4, 2025
Due Date
Apr 11, 2025
Release: Mar 4, 2025
Close: Apr 11, 2025
Work induces phase 1 offsite water improvement: 310 LF 12" dip class 350; 57 LF 16" dip class 350; 165 LF 20" dip class 350; 215 LF 24" dip class 350; 1 EA 6" blow off valve; 2 ea butterfly valves; traffic control and erosion control: 1 LS erosion control (protection of work); pavement improvements: 61,350 SF 4" ac /4" ab (with cut off curbs and rip-rap); 61,350 SF access road grading; 1 LS raise iron, bollards, signage; 468 SF concrete section of access road; 33 LF 24" sanitite hp pipe; 30 LF 30" sanitite hp pipe; 1 EA drop inlet, type f. See outside link.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis