Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work induces phase 1 offsite water improvement: 310 LF 12" dip class 350; 57 LF 16" dip class 350; 165 LF 20" dip class 350; 215 LF 24" dip class 350; 1 EA 6" blow off valve; 2 ea butterfly valves; traffic control and erosion control: 1 LS erosion control (protection of work); pavement improvements: 61,350 SF 4" ac /4" ab (with cut off curbs and rip-rap); 61,350 SF access road grading; 1 LS raise iron, bollards, signage; 468 SF concrete section of access road; 33 LF 24" sanitite hp pipe; 30 LF 30" sanitite hp pipe; 1 EA drop inlet, type f. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consists of water systems improvements - phase 3.
Posted Date
Nov 20, 2025
Due Date
Jan 29, 2026
Release: Nov 20, 2025
Close: Jan 29, 2026
Work consists of water systems improvements - phase 3.
AvailablePremium
Access the largest public sector contact database
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Posted Date
-
Due Date
Dec 12, 2025
Close: Dec 12, 2025
Procurement of services for constructing a Water Distribution System and Sanitary Sewer Improvements for Abilene Place Addition Phase 2.
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Construction contract for Cherry Hill Water System Phase I & II water line improvements — turnkey water main installation requiring a firm-fixed-price general contractor to provide all supervision, labor, materials, equipment, tools, and installation per the project manual; Virginia SCC registration and Proof of Authority to Transact Business in Virginia required.
AvailableConstruction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
Posted Date
Nov 26, 2025
Due Date
Jan 7, 2026
Release: Nov 26, 2025
Close: Jan 7, 2026
Construction of phase 1 including all utilities, storm drainage, water and wastewater pipe and appurtenances; excavation and embankment; street improvements including curbs and hmac; water quality ponds; erosion & sedimentation controls; and various other improvements. Approx. 3,000 LF 8" PVC C-900, DR-14 Potable Waterline; 48 LF 12" Ductile Iron Pipe Waterline; 14 EA 8" Gate Valve with Box and Cover; 17 Ea Fire Hydrant Assembly; 1,790 LF 8" PVC SDR-26 Gravity Wastewater Line (10'-12' depth);
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis