Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cordova Hills Town Center Village Phase 1A Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Nov 12, 2025
Close: Dec 23, 2025
Senior Center ADA Door Improvements.
AvailablePremium
Access the largest public sector contact database
Provide construction manager at risk services for center improvements. The construction manager shall participate in the design process, perform construction cost estimating and constructability services, value engineering analysis, manage the schedule and perform construction services.
Posted Date
Aug 18, 2025
Due Date
Jan 20, 2026
Release: Aug 18, 2025
Close: Jan 20, 2026
Provide construction manager at risk services for center improvements. The construction manager shall participate in the design process, perform construction cost estimating and constructability services, value engineering analysis, manage the schedule and perform construction services.
AvailableFreeport School District 145 is soliciting single-prime bids for Phase 2 building envelope improvements at Freeport Middle School, including roofing removal/recover, masonry lintel repair and repointing, and window replacement with related interior finish repairs. Bids will be received at the District Office in Freeport, Illinois. Proposals are due December 24, 2025 at 10:00 AM CST.
Posted Date
-
Due Date
Dec 24, 2025
Close: Dec 24, 2025
Freeport School District 145 is soliciting single-prime bids for Phase 2 building envelope improvements at Freeport Middle School, including roofing removal/recover, masonry lintel repair and repointing, and window replacement with related interior finish repairs. Bids will be received at the District Office in Freeport, Illinois. Proposals are due December 24, 2025 at 10:00 AM CST.
AvailableWork consisting of a ringwall is considered suitable for the 14-ft diameter finished water tank. Subgrades for the finished water tank should consist of competent residuum or new compacted structural fill following the undercut of the loose stratum a materials. An allowable contact pressure of of 2,000 psf (net allowable soil bearing pressure) is anticipated for the finished water tank. A factor of safety of 3.0 should be considered against general shear failure for this condition
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work consisting of a ringwall is considered suitable for the 14-ft diameter finished water tank. Subgrades for the finished water tank should consist of competent residuum or new compacted structural fill following the undercut of the loose stratum a materials. An allowable contact pressure of of 2,000 psf (net allowable soil bearing pressure) is anticipated for the finished water tank. A factor of safety of 3.0 should be considered against general shear failure for this condition
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis