Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Senior Center ADA Door Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes interior carpentry on the first floor (north end of the building, main lobby) which includes adding two new walls with windows, electrical. Plumbing, adding a sprinkler head. Adding an ADA button activated system to three sets of doors (two existing, one new). Electrical, adding new lighting. Interior carpentry on the first floor (main corridor) which includes removing a section of wall and putting in four new door- ways. Repositioning a door to swing in the opposite direction.
Posted Date
Sep 28, 2025
Due Date
Feb 19, 2026
Release: Sep 28, 2025
Close: Feb 19, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes interior carpentry on the first floor (north end of the building, main lobby) which includes adding two new walls with windows, electrical. Plumbing, adding a sprinkler head. Adding an ADA button activated system to three sets of doors (two existing, one new). Electrical, adding new lighting. Interior carpentry on the first floor (main corridor) which includes removing a section of wall and putting in four new door- ways. Repositioning a door to swing in the opposite direction.
Work includes 75 CY unclassified excavation; 30 CY structural concrete, class a; 30 lbs reinforcing bars grad 60 #3; 1656 LF removal of existing curb & gutter; 50 LF removal of existing retaining wall; 454 SY removal of surfacing (sidewalk & concrete drive & asphalt; 605 SY concrete sidewalk 4" (ada ramps & det. Warning surface included); 765 SY concrete drive pad 6" (rebar included); 490 LF header curb; 1140 LF concrete vertical curb and gutter type b 6" x 24"; 60 LF concrete vertical curb and gutter type b 6" x 30"; 40 LF steel post and base post for aluminium panel signs. See attached file.
Posted Date
Jan 19, 2026
Due Date
Feb 23, 2026
Release: Jan 19, 2026
Close: Feb 23, 2026
Work includes 75 CY unclassified excavation; 30 CY structural concrete, class a; 30 lbs reinforcing bars grad 60 #3; 1656 LF removal of existing curb & gutter; 50 LF removal of existing retaining wall; 454 SY removal of surfacing (sidewalk & concrete drive & asphalt; 605 SY concrete sidewalk 4" (ada ramps & det. Warning surface included); 765 SY concrete drive pad 6" (rebar included); 490 LF header curb; 1140 LF concrete vertical curb and gutter type b 6" x 24"; 60 LF concrete vertical curb and gutter type b 6" x 30"; 40 LF steel post and base post for aluminium panel signs. See attached file.
AvailableRelease: Jul 27, 2024
Close: Jan 28, 2026
Community center facility improvements.
AvailableRelease: Jan 8, 2026
Close: Feb 18, 2026
Provide ADA Improvements to its Auditorium.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →