Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Borough of Turtle Creek
Work include street reconstruction.
Posted Date
Mar 19, 2026
Due Date
Apr 8, 2026
Release: Mar 19, 2026
Borough of Turtle Creek
Close: Apr 8, 2026
Work include street reconstruction.
AvailableBorough of Turtle Creek
Provide collection of rubbish, garbage trash and recyclables to be picked up from homes, dwelling units, and other places.
Posted Date
Oct 2, 2025
Due Date
Oct 16, 2025
Release: Oct 2, 2025
Borough of Turtle Creek
Close: Oct 16, 2025
Provide collection of rubbish, garbage trash and recyclables to be picked up from homes, dwelling units, and other places.
Borough of Turtle Creek
The work essentially includes, but is not limited to the following: General Site Preparation; Belgian block removal; Roadway leveling with 9.5mm leveling Material; Placement of 4” 2A modified stone; Placement of 6” 25mm Binder Subbase course; Placement of two and one half (2 1/2”) compacted depth of Superpave 19.0mm Binder Material; Placement of one and one half (1 1/2”) compacted depth of Superpave 9.5mm Wearing Material; Placement and installation of 6” wedge curbing; All required site cleanup and site restoration and landscaping; All other related and required work.
Posted Date
Sep 25, 2025
Due Date
Oct 6, 2025
Release: Sep 25, 2025
Borough of Turtle Creek
Close: Oct 6, 2025
The work essentially includes, but is not limited to the following: General Site Preparation; Belgian block removal; Roadway leveling with 9.5mm leveling Material; Placement of 4” 2A modified stone; Placement of 6” 25mm Binder Subbase course; Placement of two and one half (2 1/2”) compacted depth of Superpave 19.0mm Binder Material; Placement of one and one half (1 1/2”) compacted depth of Superpave 9.5mm Wearing Material; Placement and installation of 6” wedge curbing; All required site cleanup and site restoration and landscaping; All other related and required work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Borough of Turtle Creek's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database