Learn more →Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
Posted Date
Dec 10, 2025
Due Date
Feb 10, 2026
Release: Dec 10, 2025
Close: Feb 10, 2026
Water main replacement includes 380 LF of 8" DICL Water Main Replacement; 2 ea 8" gate valve; 1 ea 10" by 8" Tapping Sleeve and Valve; 1 ea Fire Hydrant Assembly; 40 LF of 3/" water service replacement; 240 LF of 1" water service replacement; 300 SY trench restoration, Temporary; 450 SY trench restoration, final; 1 ea fire hydrant assembly; 1 ea of 6" hydrant valve and valve box; 5 SY Penndot paving restoration; 1 LS erosion and sedimentation controls.
AvailableInstallation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
Close: Dec 4, 2025
Installation of approx. 2,730 LF of 8" Diameter CIPP liner, replacement and raising of 8 manhole frames and covers and the lining of 8 manholes with Sprayroq, by-pass pumping and restoration as shown on the map and as specified. Construction sequence provided hereinafter is general in nature and shall provide the basis of preparation of a detailed construction schedule by Contractor: 1.Install any by-pass pumping equipment. 2.Perform preinstallation cleaning and video documentation. 3. Install CIPP lining system. 4. Replace manhole frames and covers and raise manhole to existing ground surface. 5. Install any by-pass pumping and install Sprayroq lining system in manholes. 6. Site restoration.
Work includes approx 2,200 LF of 8" pre-cleaning root cutting and televising mainline; 1 LS manhole lining with sprayroq; 7 LS bypass pumping; 2,700 LF of 8" mainline lining system CIPP; 2,700 LF of 4"-6"" mainline lining system lateral t-liner. See outside link.
Posted Date
-
Due Date
Mar 12, 2025
Close: Mar 12, 2025
Work includes approx 2,200 LF of 8" pre-cleaning root cutting and televising mainline; 1 LS manhole lining with sprayroq; 7 LS bypass pumping; 2,700 LF of 8" mainline lining system CIPP; 2,700 LF of 4"-6"" mainline lining system lateral t-liner. See outside link.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis