Discover Opportunities months before the RFP drops
Learn more →Replacement of the existing non-potable water pumps with higher capacity vertical turbine pumps with control panels, variable frequency drives (VFDs), level transmitter, and discharge pressure transmitter; replacement of the existing 10" and 30" sluice gates in the secondary clarifier splitter box (Junction Box No. 2); replacement of the sludge/scum collection equipment for Primary Clarifier Nos. 1 and 2 and Secondary Clarifier Nos. 1 and 2 and associated bridges, handrails, center column, feedwell, energy dissipating inlet, baffles, weirs, scum box, and regrouting of clarifier bottom; replacement of the aerated grit chamber equipment in three existing chambers including blowers, bucket elevator, screw conveyor, grit dewatering screw, control panels, air headers, coarse bubble diffusers, aeration swing/swivel joint assemblies, valves, electrical conduits, conductors, and control panels; replacement of the existing primary scum pumping and grinders including concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, and associated appurtenances; replacement of the existing waste activated sludge (WAS) pumps located within Recirculation Pump Station No. 1 with new vertical close-coupled, solids-handling, centrifugal pumps with concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, supports, and associated appurtenances; and, expanding the plant-wide Supervisory Control and Data Acquisition (SCADA) System by integrating the operating and alarm signals from existing unit processes/areas including but not limited to screens, influent pumping, grit, primary clarification, aeration, secondary clarification, RAS pump stations, UV, nonpotable system, and solids processing.
Posted Date
Sep 13, 2025
Due Date
Oct 15, 2025
Release: Sep 13, 2025
Close: Oct 15, 2025
Replacement of the existing non-potable water pumps with higher capacity vertical turbine pumps with control panels, variable frequency drives (VFDs), level transmitter, and discharge pressure transmitter; replacement of the existing 10" and 30" sluice gates in the secondary clarifier splitter box (Junction Box No. 2); replacement of the sludge/scum collection equipment for Primary Clarifier Nos. 1 and 2 and Secondary Clarifier Nos. 1 and 2 and associated bridges, handrails, center column, feedwell, energy dissipating inlet, baffles, weirs, scum box, and regrouting of clarifier bottom; replacement of the aerated grit chamber equipment in three existing chambers including blowers, bucket elevator, screw conveyor, grit dewatering screw, control panels, air headers, coarse bubble diffusers, aeration swing/swivel joint assemblies, valves, electrical conduits, conductors, and control panels; replacement of the existing primary scum pumping and grinders including concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, and associated appurtenances; replacement of the existing waste activated sludge (WAS) pumps located within Recirculation Pump Station No. 1 with new vertical close-coupled, solids-handling, centrifugal pumps with concrete equipment pads, VFDs, pressure switches, control panels, priming systems, piping, fittings, valves, supports, and associated appurtenances; and, expanding the plant-wide Supervisory Control and Data Acquisition (SCADA) System by integrating the operating and alarm signals from existing unit processes/areas including but not limited to screens, influent pumping, grit, primary clarification, aeration, secondary clarification, RAS pump stations, UV, nonpotable system, and solids processing.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis