Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Big Piney-Marbleton Airport Joint Powers Board
Construction of partial length parallel Taxiway B (2,000 LF ) and connectors B2 and B3 with associated electrical work (lights, lit signs, conduit, cables, duct banks). Also included is repair of a 100-ft x 10-ft section of Runway 12-30. Excavation, subgrade preparation, grading, underdrain and drainage improvements, aggregate subbase and base courses, asphalt paving, electrical and lighting improvements, and pavement markings.
Posted Date
Mar 2, 2026
Due Date
Mar 26, 2026
Release: Mar 2, 2026
Big Piney-Marbleton Airport Joint Powers Board
Close: Mar 26, 2026
Construction of partial length parallel Taxiway B (2,000 LF ) and connectors B2 and B3 with associated electrical work (lights, lit signs, conduit, cables, duct banks). Also included is repair of a 100-ft x 10-ft section of Runway 12-30. Excavation, subgrade preparation, grading, underdrain and drainage improvements, aggregate subbase and base courses, asphalt paving, electrical and lighting improvements, and pavement markings.
AvailableBig Piney-Marbleton Airport Joint Powers Board
The project consists of, but is not limited to, reconstruction of the western portion of the north General Aviation (GA) apron and Taxiway A and A2 Connector (approximately 8,900-SY) including pavement and tie-down removal, replacing existing aggregate base materials, placing new asphalt, pavement markings, grading shoulders and installing aircraft tie-downs and retroreflective markers.
Posted Date
Apr 8, 2025
Due Date
Apr 29, 2025
Release: Apr 8, 2025
Big Piney-Marbleton Airport Joint Powers Board
Close: Apr 29, 2025
The project consists of, but is not limited to, reconstruction of the western portion of the north General Aviation (GA) apron and Taxiway A and A2 Connector (approximately 8,900-SY) including pavement and tie-down removal, replacing existing aggregate base materials, placing new asphalt, pavement markings, grading shoulders and installing aircraft tie-downs and retroreflective markers.
Big Piney-Marbleton Airport Joint Powers Board
Reconstruction of the western portion of the north General Aviation (GA) apron and Taxiway A and A2 Connector (8,900-SY) including pavement and tie-down removal, excavating existing aggregate base materials before placing new asphalt, pavement markings, grading shoulders and installing aircraft tie-downs and retroreflective markers. Also included as a separate Additive Option Bid Schedule is rehabilitating the South GA apron (6,100-SY) by means of mill and overlay, crack sealing the remaining pavement and placing new asphalt pavement.
Posted Date
Feb 11, 2025
Due Date
Mar 12, 2025
Release: Feb 11, 2025
Big Piney-Marbleton Airport Joint Powers Board
Close: Mar 12, 2025
Reconstruction of the western portion of the north General Aviation (GA) apron and Taxiway A and A2 Connector (8,900-SY) including pavement and tie-down removal, excavating existing aggregate base materials before placing new asphalt, pavement markings, grading shoulders and installing aircraft tie-downs and retroreflective markers. Also included as a separate Additive Option Bid Schedule is rehabilitating the South GA apron (6,100-SY) by means of mill and overlay, crack sealing the remaining pavement and placing new asphalt pavement.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Big Piney-Marbleton Airport Joint Powers Board's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database