Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Aurora-Brule Rural Water System Inc
•Installation of a new 300kW (minimum) single unit generator set with enclosure and subbase fuel tank. •Excavation, site work, and site preparation needed for generator. •Installation of a new 800A automatic transfer switch. •Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Posted Date
Feb 26, 2026
Due Date
Mar 26, 2026
Release: Feb 26, 2026
Aurora-Brule Rural Water System Inc
Close: Mar 26, 2026
•Installation of a new 300kW (minimum) single unit generator set with enclosure and subbase fuel tank. •Excavation, site work, and site preparation needed for generator. •Installation of a new 800A automatic transfer switch. •Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
AvailableAurora-Brule Rural Water System Inc
Approximately 581 linear feet of open cut 14-inch or 16-inch diameter fused HDPE pipe with tracer wire. Approximately 46 linear feet of open cut PVC 14-inch diameter watermain pipe to connect HDPE to PVC raw water main. Connection to existing raw water pipe. Miscellaneous appurtenances including transition couplings, ductile iron fittings, joint restraints, over the bell restraints, thrust blocking, tracer wire. Replacement of existing bolts on existing fittings. See Outside link.
Posted Date
Sep 17, 2025
Due Date
Oct 9, 2025
Release: Sep 17, 2025
Aurora-Brule Rural Water System Inc
Close: Oct 9, 2025
Approximately 581 linear feet of open cut 14-inch or 16-inch diameter fused HDPE pipe with tracer wire. Approximately 46 linear feet of open cut PVC 14-inch diameter watermain pipe to connect HDPE to PVC raw water main. Connection to existing raw water pipe. Miscellaneous appurtenances including transition couplings, ductile iron fittings, joint restraints, over the bell restraints, thrust blocking, tracer wire. Replacement of existing bolts on existing fittings. See Outside link.
Aurora-Brule Rural Water System Inc
The Project includes the following Work: Approx. 1,000 LF of horizontally directionally drilled 14" dia. fused HDPE pipe with tracer wire. Approx. 40 LF of open cut PVC 14" dia. watermain pipe to connect HDPE to PVC raw water main. Connection to existing raw water pipe. Miscellaneous appurtenances including transition couplings, ductile iron fittings, joint restraints, over the bell restraints, thrust blocking, tracer wire. Replacement of existing bolts on existing fittings. Temporary and permanent erosion control, reclamation and seeding. Corrosion protection system components including galvanic anodes and test stations. Traffic control during construction. Pipeline flushing, hydrostatic pressure testing, and Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Posted Date
Mar 6, 2025
Due Date
Mar 27, 2025
Release: Mar 6, 2025
Aurora-Brule Rural Water System Inc
Close: Mar 27, 2025
The Project includes the following Work: Approx. 1,000 LF of horizontally directionally drilled 14" dia. fused HDPE pipe with tracer wire. Approx. 40 LF of open cut PVC 14" dia. watermain pipe to connect HDPE to PVC raw water main. Connection to existing raw water pipe. Miscellaneous appurtenances including transition couplings, ductile iron fittings, joint restraints, over the bell restraints, thrust blocking, tracer wire. Replacement of existing bolts on existing fittings. Temporary and permanent erosion control, reclamation and seeding. Corrosion protection system components including galvanic anodes and test stations. Traffic control during construction. Pipeline flushing, hydrostatic pressure testing, and Clean up and all other miscellaneous work required, not herein mentioned, but inferred from the construction contract documents.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Aurora-Brule Rural Water System Inc's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database