Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Assumption Parish Waterworks District No. 1
Paint and coating rehabilitation and minor structural repairs at multiple tank.
Posted Date
Feb 18, 2025
Due Date
Mar 20, 2025
Release: Feb 18, 2025
Assumption Parish Waterworks District No. 1
Close: Mar 20, 2025
Paint and coating rehabilitation and minor structural repairs at multiple tank.
Assumption Parish Waterworks District No. 1
3 MGD Water Treatment Plant Expansion.
Posted Date
Sep 24, 2024
Due Date
Oct 22, 2024
Release: Sep 24, 2024
Assumption Parish Waterworks District No. 1
Close: Oct 22, 2024
3 MGD Water Treatment Plant Expansion.
Assumption Parish Waterworks District No. 1
Approx. 17,176 LF replacement of existing 2.5" and 4" diameter waterline with a 6" diameter waterline. This work includes new service transfer connections, fire hydrants, valves and main tie-in.
Posted Date
Sep 17, 2024
Due Date
Oct 17, 2024
Release: Sep 17, 2024
Assumption Parish Waterworks District No. 1
Close: Oct 17, 2024
Approx. 17,176 LF replacement of existing 2.5" and 4" diameter waterline with a 6" diameter waterline. This work includes new service transfer connections, fire hydrants, valves and main tie-in.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Assumption Parish Waterworks District No. 1
The meeting agenda encompassed reports from the Engineering Committee and the Finance Committee. Key discussion items for the Board included the Badger Meter Upgrade to Cellular (specifically Pressure Sensing Meters), distribution updates, and plant updates. The board also reviewed suggested action items for the subsequent meeting scheduled for March 23, 2026.
The Engineering Committee meeting agenda included discussions on the Plant #5 Addition (2022 Bond Project), which involved approving invoices for Shread-Kuyrkendall & Associates, Pintail Contracting Services, and Alpha Testing and Inspection, Inc. Other agenda items covered the Administrative Building/Board Meeting Room (2022 Bond Project) and various Waterline Projects, including the Bayou L'Ourse Waterline Repair, a Capital Outlay Request for a new waterline to Paincourtville Pump Station, and discussions related to a Water Sector Grant.
The committee meeting covered updates on several ongoing bond projects. For Plant #5 Addition, concrete pouring and clarifier work were reported. The Administrative Building/Board Meeting Room project was noted to have final punch list items remaining. For the Elevated Tower Rehabilitation Project - Phase 3, the project reached 100% completion, and the release of the final retainage was approved pending the completion of the clear lien period. The committee also addressed payments for invoices related to engineering and construction inspection services for the Plant #5 Addition project and engineering services for the Capital Outlay Request for a new waterline to Paincourtville Pump Station. Updates were given on preparing a cost estimate for the Bayou L'Ourse Waterline Repair. Additionally, the committee formally requested the regular attendance of representatives for the Plant #5 Addition project.
The meeting included updates from the Engineering Committee, which resulted in the approval of all related motions and invoices. The Finance Committee's monthly reports were deemed in order, and the monthly invoices were approved for payment. A significant action was the approval of the 2026 Health Insurance Renewal Option #2 received from Gulf South Risk Services. Distribution updates were provided, including a discussion regarding upgraded AMR Meter Costs. Plant updates were also presented before the adjournment of the meeting.
The Finance Committee meeting involved reviewing the financial reports presented by President Scott Sternfels. Following the review, the committee unanimously passed a motion to recommend to the full board that all presented invoices be paid. The meeting concluded with the Finance Committee adjourning.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Assumption Parish Waterworks District No. 1's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database