Discover Opportunities months before the RFP drops
Learn more →Provide an updated heating, ventilating & air conditioning system for the county courthouse. See attached file.
Posted Date
Nov 25, 2025
Due Date
Dec 29, 2025
Release: Nov 25, 2025
Close: Dec 29, 2025
Provide an updated heating, ventilating & air conditioning system for the county courthouse. See attached file.
AvailableSeeking applications for the Designation of Public Depositories for Active Funds of Ashtabula County which have been estimated in the daily aggregate amount not to exceed $1,000,000 to $90,000,000 for the period of December 1, 2025 through November 30, 2029, inclusive, pursuant to Section 135.33(A) of the Ohio Revised Code.
Posted Date
Sep 26, 2025
Due Date
Oct 15, 2025
Release: Sep 26, 2025
Close: Oct 15, 2025
Seeking applications for the Designation of Public Depositories for Active Funds of Ashtabula County which have been estimated in the daily aggregate amount not to exceed $1,000,000 to $90,000,000 for the period of December 1, 2025 through November 30, 2029, inclusive, pursuant to Section 135.33(A) of the Ohio Revised Code.
The project scope consists of the construction of an elevated water storage tank with mixing system built to a capacity of 300,000 gallons, including all foundation work, valving, piping, and appurtenances within the tank bowl and base of the tank to be installed. Work shall also include; site work around the base of the tank, new concrete pavement, access driveway, fencing & gates, electrical work, SCADA integration, earthwork, approximately 240 LF of 12" water main connecting the base of the tower to the existing water main in SR 534, swale grading on the northern end of the site for drainage, site re-grading for access driveway and tank enclosure area, and new access driveway storm culvert.
Posted Date
Sep 12, 2025
Due Date
Oct 3, 2025
Release: Sep 12, 2025
Close: Oct 3, 2025
The project scope consists of the construction of an elevated water storage tank with mixing system built to a capacity of 300,000 gallons, including all foundation work, valving, piping, and appurtenances within the tank bowl and base of the tank to be installed. Work shall also include; site work around the base of the tank, new concrete pavement, access driveway, fencing & gates, electrical work, SCADA integration, earthwork, approximately 240 LF of 12" water main connecting the base of the tower to the existing water main in SR 534, swale grading on the northern end of the site for drainage, site re-grading for access driveway and tank enclosure area, and new access driveway storm culvert.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis