Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Alpha Ranch Wcid
Work includes approx 6,865 LF of 8" water main, 4,846 LF 8" sanitary sewer main, and 5,121 LF 21" rcp to 5'x4' rcb storm sewer.
Posted Date
Jul 18, 2026
Due Date
Aug 12, 2026
Release: Jul 18, 2026
Alpha Ranch Wcid
Close: Aug 12, 2026
Work includes approx 6,865 LF of 8" water main, 4,846 LF 8" sanitary sewer main, and 5,121 LF 21" rcp to 5'x4' rcb storm sewer.
AvailableAlpha Ranch Wcid
Alpha Ranch Water Control and Improvement District No. 1 of Denton and Wise Counties, Texas is soliciting bids via Invitation to Bid (ITB) for paving improvements serving Alpha Ranch Phases 4D & 5A. The scope includes approximately 21,096 SY of 6-inch concrete pavement and 10,059 SF of 4-inch concrete sidewalk located in the Frisco/Denton area of Denton County, Texas. The project is administered by BGE, Inc. as the District's engineer and bid through CIVCAST.
Posted Date
-
Due Date
Jul 18, 2026
Alpha Ranch Wcid
Close: Jul 18, 2026
Alpha Ranch Water Control and Improvement District No. 1 of Denton and Wise Counties, Texas is soliciting bids via Invitation to Bid (ITB) for paving improvements serving Alpha Ranch Phases 4D & 5A. The scope includes approximately 21,096 SY of 6-inch concrete pavement and 10,059 SF of 4-inch concrete sidewalk located in the Frisco/Denton area of Denton County, Texas. The project is administered by BGE, Inc. as the District's engineer and bid through CIVCAST.
Alpha Ranch Wcid
The project scope includes approx. right turn lane, 2 left turn lanes, acceleration lane, removal of an existing cross over and creation of a new one.
Posted Date
May 16, 2026
Due Date
Jun 10, 2026
Release: May 16, 2026
Alpha Ranch Wcid
Close: Jun 10, 2026
The project scope includes approx. right turn lane, 2 left turn lanes, acceleration lane, removal of an existing cross over and creation of a new one.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Auditor (Partner, McCall Gibson Swedlund Barfoot Ellis PLLC)
Premium
Access the largest public sector contact database
© 2026 Starbridge