Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Allentown Parking Authority
Repair of a steel channel tied to soil anchors. Project consists of repairs to soil anchor steel retention system for an existing concrete retaining wall on the west side of the parking structure for the base bid. The steel retention system requires cleaning and painting the steel components (steel channels and plates). Steel plates are required to reinforce the top side steel channel which is toed up at the bottom of the wall. Install galvanized metal cap for both topside channels at the top and bottom of wall. The alternate #1 includes vertical concrete wall spall repairs at the existing beam pockets on the existing concrete retaining wall.
Posted Date
May 11, 2026
Due Date
Jun 8, 2026
Release: May 11, 2026
Allentown Parking Authority
Close: Jun 8, 2026
Repair of a steel channel tied to soil anchors. Project consists of repairs to soil anchor steel retention system for an existing concrete retaining wall on the west side of the parking structure for the base bid. The steel retention system requires cleaning and painting the steel components (steel channels and plates). Steel plates are required to reinforce the top side steel channel which is toed up at the bottom of the wall. Install galvanized metal cap for both topside channels at the top and bottom of wall. The alternate #1 includes vertical concrete wall spall repairs at the existing beam pockets on the existing concrete retaining wall.
AvailableAllentown Parking Authority
Project consists of performing full depth repairs to the elevated concrete slab and concrete curbs at levels 2 through 3 for the Base bid and at level 4 for Alternate #1. In addition to concrete slab and curb repairs overhead concrete beam and vertical concrete column/wall spall repairs for Base bid. In addition to the concrete repairs, painting the line striping at the full depth repairs is included in the base bid. The alternate #1 bid also includes the line striping and remove/replace drain.
Posted Date
Apr 29, 2026
Due Date
May 27, 2026
Release: Apr 29, 2026
Allentown Parking Authority
Close: May 27, 2026
Project consists of performing full depth repairs to the elevated concrete slab and concrete curbs at levels 2 through 3 for the Base bid and at level 4 for Alternate #1. In addition to concrete slab and curb repairs overhead concrete beam and vertical concrete column/wall spall repairs for Base bid. In addition to the concrete repairs, painting the line striping at the full depth repairs is included in the base bid. The alternate #1 bid also includes the line striping and remove/replace drain.
Allentown Parking Authority
Construction of a Parking Lot. Remove existing stone fill material to a depth that allows for the installation of the new Subbase, Binder Course, and Wearing Course. Remove existing Curb and sidewalk to allow for the construction of the new curb and sidewalk. Place new subbase, binder course, and wearing course. Install new curb and sidewalk. Design and Coordinate with PPL the parking lot lighting system. Install new lighting system. Prepare landscape area and install new trees and shrubs. Clean area and remove E&S Controls.
Posted Date
Apr 2, 2026
Due Date
Apr 29, 2026
Release: Apr 2, 2026
Allentown Parking Authority
Close: Apr 29, 2026
Construction of a Parking Lot. Remove existing stone fill material to a depth that allows for the installation of the new Subbase, Binder Course, and Wearing Course. Remove existing Curb and sidewalk to allow for the construction of the new curb and sidewalk. Place new subbase, binder course, and wearing course. Install new curb and sidewalk. Design and Coordinate with PPL the parking lot lighting system. Install new lighting system. Prepare landscape area and install new trees and shrubs. Clean area and remove E&S Controls.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Allentown Parking Authority
The board meeting focused on strategic program updates including the status of capital projects, RACP grants, and coordination for downtown redevelopment. Discussions covered operational observations from snow emergency responses, enforcement activity metrics, and upcoming technology initiatives such as LPR camera installations and pilot programs for hands-free parking entry. Additionally, the board addressed the development of a comprehensive parking policy framework, administrative requirements regarding ethics filings, the status of the North Lot RFP, and a review of the financial performance for January.
The board meeting covered several key operational and financial areas, including officer elections for the upcoming term. Discussions included progress on RACP grants and the North Lot RFP, updates on capital projects such as the 940 Deck and Ridge Avenue Development, and contract negotiations regarding the Art Museum Lot, including environmental review and parking permit structures. The board also addressed banking authorizations, audit services engagement, and snowstorm response feedback. Reports were provided on enforcement statistics, customer appeals for late 2025, and a comprehensive financial overview of revenue, operating expenses, and payment plan statuses.
Key discussions during the meeting included updates on grant applications (RACP and two LSA grants for equipment purchase and Spiral Garage structural repairs). Real estate matters involved securing legal possession of 409 Ridge Avenue, proceeding with an RFP for contractors, and responding to a redlined agreement of sale for the Allentown Art Museum. An RFP for the redevelopment of the 100 block of North 7th Street, accommodating a potential 7-Eleven relocation, is scheduled for December 1st. Infrastructure updates noted the near completion of generator installation at the 940 Deck and the installation of new illuminated signage. The Board approved continuing free parking promotions during December. The proposed 2026 budget was reviewed and approved, projecting $19.1 million in revenue and a 32% increase in expenses, primarily due to personnel costs and health insurance premiums, resulting in an estimated net surplus of $34,000. Garage performance metrics were presented, noting a significant revenue decline at the 940 Deck. The Board also reviewed and approved a resolution authorizing a $3.2 million drawdown loan with ESSA Bank to finance capital projects through 2027, including Spiral Deck repairs and Government Deck remediation. Enforcement and appeals reports for October were reviewed. A resident advocated for a residential handicapped parking program, which the Executive Director agreed to research. Finally, the Board was informed of Secretary Santo Napoli's resignation.
The meeting included reports from the Executive Director, Enforcement, Appeals, and Finance departments. Discussions covered the placement of kiosks at the 940 Deck, generator installation progress, and potential LSA Grant applications. Enforcement updates focused on Hamilton and 7th Street corridors, recognition of an officer, inspection sticker fraud training, and potential tiered fine structure. The Appeals summary and financial reports for September were reviewed, including revenues, expenses, and net gain. Payment plan statistics were also presented. An executive session was held with no action taken.
The meeting addressed public concerns regarding equity in enforcement, Facebook blocking clarifications, and ticket disputes for disabled vehicles, and property acquisition appeals. The finalized 2024 audit was presented, highlighting key financial metrics such as net position, operating revenue, operating expenses, capital additions, liabilities, and bond coverage. A parking optimization study was presented, covering meter deployment, loading zones, and valet operations. Updates were given on digital services, enforcement, and technology, including the launch of an online payment portal and policy enhancements. Capital projects and infrastructure updates were discussed, including spiral deck restoration, garage and generator installation, RACP and Art Museum coordination, and city center revenue. The financial report for April 2025 was reviewed.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Allentown Parking Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Deputy Director of Enforcement and Customer Service
Deputy Director of Finance, Community Relations, Maintenance and Projects
Premium
Access the largest public sector contact database
© 2026 Starbridge