Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Alabama State Port Authority, Information Technology
Provide replace rubber boot where conduit goes through roof of trailer, replace rear a/c unit with rp-ac3800-w-kt recpro 15k heat pump by houghton.
Posted Date
Apr 21, 2026
Due Date
Apr 24, 2026
Release: Apr 21, 2026
Alabama State Port Authority, Information Technology
Close: Apr 24, 2026
Provide replace rubber boot where conduit goes through roof of trailer, replace rear a/c unit with rp-ac3800-w-kt recpro 15k heat pump by houghton.
Alabama State Port Authority, Information Technology
Work includes repairs to isu trailer, rotate (2) windows on curb side of trailer so that weep holes are facing down to allow proper drainage, replace front a/c unit with rp-ac3800-w-kt- recpro 15k heat pump houghton, replace boot where conduit enters roof of trailer.
Posted Date
Feb 24, 2026
Due Date
Feb 27, 2026
Release: Feb 24, 2026
Alabama State Port Authority, Information Technology
Close: Feb 27, 2026
Work includes repairs to isu trailer, rotate (2) windows on curb side of trailer so that weep holes are facing down to allow proper drainage, replace front a/c unit with rp-ac3800-w-kt- recpro 15k heat pump houghton, replace boot where conduit enters roof of trailer.
Alabama State Port Authority, Information Technology
Work includes 50a240vac circuit in conduct to driver's side wall to be mounted mid-ship for shore power connection, 20a120vac convenience receptacles, single duplex, to be installed on driver's side wall with 2 per section of the building framing, 20a120vac convenience receptacles, single duplex, to be installed on passenger side wall with 2 per section of the building framing, 20a120vac convenience receptacles, single duplex, to be installed on the rear interior wall, 30a240vac circuit to be mounted on the driver's side of the roll-up door and stored in a conduit box for future air compressor, 50a240vac circuit in conduit to exterior wall near electrical for shore power connection.
Posted Date
Feb 17, 2026
Due Date
Feb 20, 2026
Release: Feb 17, 2026
Alabama State Port Authority, Information Technology
Close: Feb 20, 2026
Work includes 50a240vac circuit in conduct to driver's side wall to be mounted mid-ship for shore power connection, 20a120vac convenience receptacles, single duplex, to be installed on driver's side wall with 2 per section of the building framing, 20a120vac convenience receptacles, single duplex, to be installed on passenger side wall with 2 per section of the building framing, 20a120vac convenience receptacles, single duplex, to be installed on the rear interior wall, 30a240vac circuit to be mounted on the driver's side of the roll-up door and stored in a conduit box for future air compressor, 50a240vac circuit in conduit to exterior wall near electrical for shore power connection.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Alabama State Port Authority, Information Technology's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database