Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the design and construction support of a finished water storage tank to serve Erie's Zone 3, a pump station, and associated water transmission pipeline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Providing a new 250,000 GAL concrete tank; providing a new water tank mixer and appurtenances providing a new access road and other required site work providing a new water storage tank feed line, including all required valves, fittings, and appurtenances providing a new water storage tank overflow and drain line, including all required valves, fittings, and appurtenances providing a new overflow catch-basin, metering manhole, and valve vault (pre-cast concrete structures) providing a new electrical shed structure performance of tie-ins to existing watermain system providing a new electrical service for new mixing equipment, lighting, and level sensors providing a new site security chain link fence and access gate (12 wide double gate) draining and demolition of existing water storage tank
Posted Date
Feb 2, 2026
Due Date
Feb 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 27, 2026
Providing a new 250,000 GAL concrete tank; providing a new water tank mixer and appurtenances providing a new access road and other required site work providing a new water storage tank feed line, including all required valves, fittings, and appurtenances providing a new water storage tank overflow and drain line, including all required valves, fittings, and appurtenances providing a new overflow catch-basin, metering manhole, and valve vault (pre-cast concrete structures) providing a new electrical shed structure performance of tie-ins to existing watermain system providing a new electrical service for new mixing equipment, lighting, and level sensors providing a new site security chain link fence and access gate (12 wide double gate) draining and demolition of existing water storage tank
AvailableProject consists of the installation of two 250,000-gal groundwater storage tanks and appurtenant work, a 10,000-gal hydropneumatic tank and appurtenant work, installation of a water booster pump building and pumps and appurtenant work, sodium hypochlorite system and other appurtenant work, yard piping, construction of foundations, site work including subgrade prep, electrical work and controls, generator installation, telemetry, connections to existing waterlines, erosion and sedimentation controls, restoration and revegetation and all other appurtenant work.
Posted Date
Aug 4, 2023
Due Date
Feb 24, 2026
Release: Aug 4, 2023
Close: Feb 24, 2026
Project consists of the installation of two 250,000-gal groundwater storage tanks and appurtenant work, a 10,000-gal hydropneumatic tank and appurtenant work, installation of a water booster pump building and pumps and appurtenant work, sodium hypochlorite system and other appurtenant work, yard piping, construction of foundations, site work including subgrade prep, electrical work and controls, generator installation, telemetry, connections to existing waterlines, erosion and sedimentation controls, restoration and revegetation and all other appurtenant work.
AvailableDivision 1 - Elevated Storage Tank: Furnish all labor, materials, equipment, and incidentals to construct and erect a new 1,000,000 gallon elevated storage tank with 161 feet to high-water-level, including but not limited to the following: mobilization and design, foundation, fabrication and erection, surface preparation and coating, site work and piping, electrical and tank mixing system, and miscellaneous associated work. The Base Bid is for a multi-column tank with a maximum bowl height of 33 feet, Alternate A is for a multi-column tank with a maximum bowl height of 40 feet, and Alternate B is for a pedestal tank.
Posted Date
Jan 21, 2026
Due Date
Feb 19, 2026
Release: Jan 21, 2026
Close: Feb 19, 2026
Division 1 - Elevated Storage Tank: Furnish all labor, materials, equipment, and incidentals to construct and erect a new 1,000,000 gallon elevated storage tank with 161 feet to high-water-level, including but not limited to the following: mobilization and design, foundation, fabrication and erection, surface preparation and coating, site work and piping, electrical and tank mixing system, and miscellaneous associated work. The Base Bid is for a multi-column tank with a maximum bowl height of 33 feet, Alternate A is for a multi-column tank with a maximum bowl height of 40 feet, and Alternate B is for a pedestal tank.
AvailableInstallation of a 1,000 gallon gasoline fuel tank including site improvements, fuel tank, dispensing system, electrical power supply, and new mechanical fuel dispensers for existing 8,000 gallon and 15,000 gallon diesel fuel tanks, as well as other work in accordance with the Contract Documents.
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
Installation of a 1,000 gallon gasoline fuel tank including site improvements, fuel tank, dispensing system, electrical power supply, and new mechanical fuel dispensers for existing 8,000 gallon and 15,000 gallon diesel fuel tanks, as well as other work in accordance with the Contract Documents.