Summary
Perform building envelope repairs, glazing replacement, roofing system repairs and replacements, vestibule renovations, and new access installation at the Medical Center. Work includes exterior envelope repairs to Building 1 and OPC elements, including non‑abrasive cleaning, inspection, and targeted restoration of terra cotta, stucco, concrete, fenestration, and associated architectural components. Glazing replacement at Building 1, OPC, and consists of removing outdated single‑ and double‑glazed units and installing new high‑performance insulated glazing systems with coordinated phasing to maintain operations, environmental control, infection control, and security. Roof repairs at the OPC and Building 1 West Wing include investigating active leaks, removing failed roofing materials and moisture‑damaged insulation, and installing new components to restore proper drainage and watertight performance, including drain and flashing replacement.