Summary
Phase 1 is to install a WWDS at Bldg. 330/Main Gate that can notify on duty SFS with a sound annunciation. Phase 2 is to install a WWDS at Bldg. 803/Housing Gate that can notify on duty SFS with a sound annunciation. Phase 3 will consist of the installation of WWDS at Bldg. 105/CVI that can notify on duty SFS with a sound annunciation. Phase 4 will consist of the installation of WWDS at Bldg. 640/North Gate that can notify on duty SFS with a sound annunciation Power supply locations will be advised through CES. CES will have to have all their work done with moving and relocating the power supply for the locations that the WWDS will be getting installed at before the contractor can start their installation. The Contractor will be responsible for installing and configuring 4 complete systems at the designated locations determined by ISS, who will verify all angles are accurate. The contractor will remove all existing equipment and install WWDS using new infrastructure (newly installed equipment from the contracted company that was not in place before installation) that is provided from the contracted company. The
contractor will be responsible for repairing any concrete, grass, asphalt or any material that is removed for any installation purposes to the original or better condition. The contractor will train four individuals on the use of the system and basic troubleshooting steps. See attached file.