Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement for the replacement of fuel tanks at Wrangell High School and the Public Safety Building, including demolition, relocation and installation of aboveground fuel-oil storage tanks, associated infrastructure, and site restoration.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
26-21 Removal & Replacement of Fuel Storage Tank.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
26-21 Removal & Replacement of Fuel Storage Tank.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The State of Connecticut Department of Administrative Services (DAS) Procurement is soliciting qualifications for the Motor Pool Fuel Tank Replacement (Supplemental) project for the University of Connecticut, covering fuel tanks, systems, and related building/facility construction services. This procurement is issued as a Request for Qualifications; solicitation documents are hosted on the buyerâs procurement portal (HuskyBuy/WebProcure) and require accessing the original posting to retrieve full bid documents. The opportunity opened on 2026-01-14 and is scheduled to close on 2026-02-03 and is active as of 2026-01-15.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
The State of Connecticut Department of Administrative Services (DAS) Procurement is soliciting qualifications for the Motor Pool Fuel Tank Replacement (Supplemental) project for the University of Connecticut, covering fuel tanks, systems, and related building/facility construction services. This procurement is issued as a Request for Qualifications; solicitation documents are hosted on the buyerâs procurement portal (HuskyBuy/WebProcure) and require accessing the original posting to retrieve full bid documents. The opportunity opened on 2026-01-14 and is scheduled to close on 2026-02-03 and is active as of 2026-01-15.
AvailableTopeka Public Schools is soliciting bids for replacement of storefront windows, doors/hardware, and installation of solid and solar roller shades at Topeka West High School Building B. A mandatory pre-bid meeting is scheduled for 2026-01-20 and bids are due 2026-01-27; the contract is projected to start 2026-02-06 and complete by 2026-07-12. This is an Invitation for Bid for a construction contract (not a grant) with an estimated budget of $200,000–$500,000.
Posted Date
Jan 13, 2026
Due Date
Jan 27, 2026
Release: Jan 13, 2026
Close: Jan 27, 2026
Topeka Public Schools is soliciting bids for replacement of storefront windows, doors/hardware, and installation of solid and solar roller shades at Topeka West High School Building B. A mandatory pre-bid meeting is scheduled for 2026-01-20 and bids are due 2026-01-27; the contract is projected to start 2026-02-06 and complete by 2026-07-12. This is an Invitation for Bid for a construction contract (not a grant) with an estimated budget of $200,000–$500,000.
AvailableProvide motor pool fuel tank replacement. Remove the existing uconn motor pool fueling station, and deliver a fully operational fueling system comprised of two (2) 10,000 gallon underground storage tanks (USTs), one for gasoline and the other for diesel, associated piping, leak detection, stage i vapor recovery, electrical and controls, integration with current usage monitoring system, civil/site restoration, and turnover training.
Posted Date
Dec 1, 2025
Due Date
Feb 3, 2026
Release: Dec 1, 2025
Close: Feb 3, 2026
Provide motor pool fuel tank replacement. Remove the existing uconn motor pool fueling station, and deliver a fully operational fueling system comprised of two (2) 10,000 gallon underground storage tanks (USTs), one for gasoline and the other for diesel, associated piping, leak detection, stage i vapor recovery, electrical and controls, integration with current usage monitoring system, civil/site restoration, and turnover training.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →