Summary
Work includes replacement of the existing chiller that provides the heating / cooling for phifer hall, which has become outdated and inefficient; adding new rental tap connections with proper valving; placing current butterfly valves with new; re-use current concrete pads, any additional concrete is in contract; provide all new closed cell elastomeric insulation with aluminum jacket covering; replace heat tracer line with new; connect and establish controls to existing johnson controls facility explorer with graphics; replace any and all pressure and temperature gauges with new; all refrigerate removed from current chiller and once removed, remain on site for demo by wpcc; provide louvered panels on new chiller.