Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes replacement of the existing chiller that provides the heating / cooling for phifer hall, which has become outdated and inefficient; adding new rental tap connections with proper valving; placing current butterfly valves with new; re-use current concrete pads, any additional concrete is in contract; provide all new closed cell elastomeric insulation with aluminum jacket covering; replace heat tracer line with new; connect and establish controls to existing johnson controls facility explorer with graphics; replace any and all pressure and temperature gauges with new; all refrigerate removed from current chiller and once removed, remain on site for demo by wpcc; provide louvered panels on new chiller.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 7, 2025
Close: Dec 30, 2025
Replacement of Chiller #1 at Hall
AvailableGordon State College is requesting bids for replacement of the air-cooled chiller at Alumni Hall, including demolition of the existing unit, installation of a new air-cooled chiller, BMS integration, electrical work, protection of existing structures, and provision of temporary rental cooling during installation. A mandatory pre-bid meeting is scheduled at the Facilities conference room in Barnesville, GA on December 18, 2025 at 10:00 AM and all interested contractors must attend. The solicitation is issued under the Board of Regents of the University System of Georgia with NBP Engineers, Inc. as the design professional; bidders must meet experience, licensing, and staffing requirements.
Posted Date
Dec 11, 2025
Due Date
Jan 12, 2026
Release: Dec 11, 2025
Close: Jan 12, 2026
Gordon State College is requesting bids for replacement of the air-cooled chiller at Alumni Hall, including demolition of the existing unit, installation of a new air-cooled chiller, BMS integration, electrical work, protection of existing structures, and provision of temporary rental cooling during installation. A mandatory pre-bid meeting is scheduled at the Facilities conference room in Barnesville, GA on December 18, 2025 at 10:00 AM and all interested contractors must attend. The solicitation is issued under the Board of Regents of the University System of Georgia with NBP Engineers, Inc. as the design professional; bidders must meet experience, licensing, and staffing requirements.
Provide Chiller Replacement .
Posted Date
Nov 15, 2025
Due Date
Dec 16, 2025
Release: Nov 15, 2025
Close: Dec 16, 2025
Provide Chiller Replacement .
AvailableWork includes removal and replacement of cooling towers, chillers, and all associated piping.
Posted Date
Dec 2, 2025
Due Date
Jan 13, 2026
Release: Dec 2, 2025
Close: Jan 13, 2026
Work includes removal and replacement of cooling towers, chillers, and all associated piping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis