Summary
Two projects are included in this advertisement. The first project is the City of Kissimmee Woodside Drainage Improvements, Phase 2 that begins at Heron Ditch east of Dyer Boulevard and continues to the west through the Kissimmee Gateway Airport to the outfall at Shingle Creek. A 72-inch storm sewer will be constructed from the Heron Ditch, under Dyer Boulevard, and into the existing airport ditch. The existing ditch within the airport will be regraded and armored. A 72-inch storm sewer will be constructed from the airport ditch, under Hoagland Boulevard, to the existing ditch along the Kissimmee Trail. The 72-inch pipe will be jack and bored under Hoagland Boulevard. The existing ditch along the Kissimmee Trail will be regraded and armored. Construction activities also include pavement, drainage structures, concrete curb and gutter, concrete sidewalk, guardrail, fencing, clearing and grubbing, earthwork, grading, and sodding. The second project is the Toho Water Authority Woodside Utility Relocations, Phase 2 that consists of relocating a 16-inch reclaimed watermain, a 16-inch watermain, and a 20-inch sanitary force main in the area of Hoagland Boulevard. The scope also includes relocating a 30-inch sanitary force main adjacent to the ditch within the Kissimmee Gateway Airport and along Dyer Boulevard, as well as relocating a 12-inch watermain and a 30-inch reclaimed watermain in the area of Dyer Boulevard.