Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Kissimmee
Two projects are included in this advertisement. The first project is the City of Kissimmee Woodside Drainage Improvements, Phase 2 that begins at Heron Ditch east of Dyer Boulevard and continues to the west through the Kissimmee Gateway Airport to the outfall at Shingle Creek. A 72-inch storm sewer will be constructed from the Heron Ditch, under Dyer Boulevard, and into the existing airport ditch. The existing ditch within the airport will be regraded and armored. A 72-inch storm sewer will be constructed from the airport ditch, under Hoagland Boulevard, to the existing ditch along the Kissimmee Trail. The 72-inch pipe will be jack and bored under Hoagland Boulevard. The existing ditch along the Kissimmee Trail will be regraded and armored. Construction activities also include pavement, drainage structures, concrete curb and gutter, concrete sidewalk, guardrail, fencing, clearing and grubbing, earthwork, grading, and sodding. The second project is the Toho Water Authority Woodside Utility Relocations, Phase 2 that consists of relocating a 16-inch reclaimed watermain, a 16-inch watermain, and a 20-inch sanitary force main in the area of Hoagland Boulevard. The scope also includes relocating a 30-inch sanitary force main adjacent to the ditch within the Kissimmee Gateway Airport and along Dyer Boulevard, as well as relocating a 12-inch watermain and a 30-inch reclaimed watermain in the area of Dyer Boulevard.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Jerseyville
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
Posted Date
-
Due Date
Dec 17, 2025
City of Jerseyville
Close: Dec 17, 2025
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
AvailableCity of Marlin
The City of Marlin is soliciting bids for Phase 2 water quality and drainage system improvements across multiple street segments in Falls County, Texas, with a pre‑bid meeting on December 4, 2025. Bids are due December 11, 2025 at 10:00 AM CST.
Posted Date
-
Due Date
Dec 11, 2025
City of Marlin
Close: Dec 11, 2025
The City of Marlin is soliciting bids for Phase 2 water quality and drainage system improvements across multiple street segments in Falls County, Texas, with a pre‑bid meeting on December 4, 2025. Bids are due December 11, 2025 at 10:00 AM CST.
AvailableTown of Southbridge
Roadway & infrastructure improvements. Work includes full depth pavement reconstruction, installation of new cement concrete walk, resetting existing and new granite curb, new ADA pedestrian ramps, drainage upgrades including installation of new catch basin, drop inlet and manhole structures, installation of new modular or MSE retaining wall, signage, pavement markings and other incidental work.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Town of Southbridge
Close: Nov 21, 2025
Roadway & infrastructure improvements. Work includes full depth pavement reconstruction, installation of new cement concrete walk, resetting existing and new granite curb, new ADA pedestrian ramps, drainage upgrades including installation of new catch basin, drop inlet and manhole structures, installation of new modular or MSE retaining wall, signage, pavement markings and other incidental work.
AvailableCity of Brownsville
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
Posted Date
Oct 18, 2025
Due Date
Dec 2, 2025
Release: Oct 18, 2025
City of Brownsville
Close: Dec 2, 2025
Coffee Road Roadway, Drainage, and Utility Improvements Project. Work includes demolition, site grading, installation of storm drainage and water/wastewater utilities, roadway reconstruction, paving, striping, and associated traffic control includes 1,763 LF 24" class III RCP, 2 EA 4 foot diameter precast concrete manhole, 20 LF 6" DR-25 PVC fire line (incl. all reqd. fittings, restraints, and adapters), 3,150 LF 12" DR-25 PVC waterline (incl. all reqd. fittings, restraints, and adapters), 1,045 LF 12' SDR-35 PVC sanitary sewer line 0-8 foot depht, 20 LF 20" open cut steel casing.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis