Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Marlin
The City of Marlin is soliciting bids for Phase 2 water quality and drainage system improvements across multiple street segments in Falls County, Texas, with a pre‑bid meeting on December 4, 2025. Bids are due December 11, 2025 at 10:00 AM CST.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Jerseyville
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
Posted Date
-
Due Date
Dec 17, 2025
City of Jerseyville
Close: Dec 17, 2025
The City of Jerseyville intends to construct Pleasant Street Drainage Improvements – Phase 2, including storm sewer construction, lining, grading, and pavement patching. Bids are due December 17, 2025.
AvailableTownship of Grand Tower
Project consists of water distribution system improvements.
Posted Date
Oct 16, 2025
Due Date
Dec 2, 2025
Release: Oct 16, 2025
Township of Grand Tower
Close: Dec 2, 2025
Project consists of water distribution system improvements.
AvailableCity of Kissimmee
Two projects are included in this advertisement. The first project is the City of Kissimmee Woodside Drainage Improvements, Phase 2 that begins at Heron Ditch east of Dyer Boulevard and continues to the west through the Kissimmee Gateway Airport to the outfall at Shingle Creek. A 72-inch storm sewer will be constructed from the Heron Ditch, under Dyer Boulevard, and into the existing airport ditch. The existing ditch within the airport will be regraded and armored. A 72-inch storm sewer will be constructed from the airport ditch, under Hoagland Boulevard, to the existing ditch along the Kissimmee Trail. The 72-inch pipe will be jack and bored under Hoagland Boulevard. The existing ditch along the Kissimmee Trail will be regraded and armored. Construction activities also include pavement, drainage structures, concrete curb and gutter, concrete sidewalk, guardrail, fencing, clearing and grubbing, earthwork, grading, and sodding. The second project is the Toho Water Authority Woodside Utility Relocations, Phase 2 that consists of relocating a 16-inch reclaimed watermain, a 16-inch watermain, and a 20-inch sanitary force main in the area of Hoagland Boulevard. The scope also includes relocating a 30-inch sanitary force main adjacent to the ditch within the Kissimmee Gateway Airport and along Dyer Boulevard, as well as relocating a 12-inch watermain and a 30-inch reclaimed watermain in the area of Dyer Boulevard.
Posted Date
Nov 2, 2025
Due Date
Dec 12, 2025
Release: Nov 2, 2025
City of Kissimmee
Close: Dec 12, 2025
Two projects are included in this advertisement. The first project is the City of Kissimmee Woodside Drainage Improvements, Phase 2 that begins at Heron Ditch east of Dyer Boulevard and continues to the west through the Kissimmee Gateway Airport to the outfall at Shingle Creek. A 72-inch storm sewer will be constructed from the Heron Ditch, under Dyer Boulevard, and into the existing airport ditch. The existing ditch within the airport will be regraded and armored. A 72-inch storm sewer will be constructed from the airport ditch, under Hoagland Boulevard, to the existing ditch along the Kissimmee Trail. The 72-inch pipe will be jack and bored under Hoagland Boulevard. The existing ditch along the Kissimmee Trail will be regraded and armored. Construction activities also include pavement, drainage structures, concrete curb and gutter, concrete sidewalk, guardrail, fencing, clearing and grubbing, earthwork, grading, and sodding. The second project is the Toho Water Authority Woodside Utility Relocations, Phase 2 that consists of relocating a 16-inch reclaimed watermain, a 16-inch watermain, and a 20-inch sanitary force main in the area of Hoagland Boulevard. The scope also includes relocating a 30-inch sanitary force main adjacent to the ditch within the Kissimmee Gateway Airport and along Dyer Boulevard, as well as relocating a 12-inch watermain and a 30-inch reclaimed watermain in the area of Dyer Boulevard.
AvailableNorth Lafourche Levee District
North Lafourche Levee District is soliciting sealed bids for roadway and drainage improvements on Bayou Road as part of the Zeller/Larousse Forced Drainage System Phase III. Work will elevate sections of road and improve flood protection/drainage; bidders must obtain bid documents and submit via Central Auction House.
Posted Date
-
Due Date
Dec 12, 2025
North Lafourche Levee District
Close: Dec 12, 2025
North Lafourche Levee District is soliciting sealed bids for roadway and drainage improvements on Bayou Road as part of the Zeller/Larousse Forced Drainage System Phase III. Work will elevate sections of road and improve flood protection/drainage; bidders must obtain bid documents and submit via Central Auction House.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis