Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Oceanside
Proposed work includes restoring approx. 16 LF of existing walking trail. This will involve mobilization and demobilization, implementation of water pollution control measures, acquisition of necessary permits, preparation of traffic control plans and execution of traffic control. Site activities will include excavation and site preparation, followed by compaction and installation of geotextile fabric. Slurry materials will be furnished and installed to support the structural base. The restoration will also include furnishing and installing permeable pavers and a 6" concrete curb with rebar reinforcement. Stone and mortar will be placed as specified. The scope also includes coring of the existing concrete pad and grout injection of the existing concrete pad as specified.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Fairhope
The City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
Posted Date
-
Due Date
Dec 18, 2025
City of Fairhope
Close: Dec 18, 2025
The City of Fairhope seeks qualified contractors for the Magnolia Beach Restoration and Stabilization Project, involving restoration of 650 linear feet of beach, placement of 7,700 cubic yards of sand, construction of rock headland breakwater structures, and installation of sod and sand fencing.
AvailableTown of Jamaica
Demolition and site stabilization project along with separate streambank stabilization project. To demolish and/or remove all improvements, including but not limited to, septic systems, water wells, buildings, foundations, electrical and phone lines, pavement, parking, fuel tanks, debris, and household hazardous materials. All asbestos-containing material shall be abated by a firm licensed to do such work in vermont in accordance with vermont rules prior to demolition. Contractors are responsible for returning the project site to a smooth, graded, stabilized, and vegetated condition that is in accordance with all applicable federal, state, and local statutes, policies, plans, and regulations.
Posted Date
-
Due Date
Nov 28, 2025
Town of Jamaica
Close: Nov 28, 2025
Demolition and site stabilization project along with separate streambank stabilization project. To demolish and/or remove all improvements, including but not limited to, septic systems, water wells, buildings, foundations, electrical and phone lines, pavement, parking, fuel tanks, debris, and household hazardous materials. All asbestos-containing material shall be abated by a firm licensed to do such work in vermont in accordance with vermont rules prior to demolition. Contractors are responsible for returning the project site to a smooth, graded, stabilized, and vegetated condition that is in accordance with all applicable federal, state, and local statutes, policies, plans, and regulations.
City of Tega Cay
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
City of Tega Cay
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailableCity of Wheeling
The City of Wheeling (WV) seeks bids for the Wheeling Drainage Ditch Stabilization Project to stabilize and restore the drainage ditch from Northgate Parkway to Dundee Road (station 10+00 to 34+00) using gabions, stone riprap revetment, floodplain benching, native seeding, and rock riffles. The project requires the contractor to provide all equipment, materials, labor, training, warranties, and construction/installation services necessary to complete the described improvements.
Posted Date
-
Due Date
Dec 9, 2025
City of Wheeling
Close: Dec 9, 2025
The City of Wheeling (WV) seeks bids for the Wheeling Drainage Ditch Stabilization Project to stabilize and restore the drainage ditch from Northgate Parkway to Dundee Road (station 10+00 to 34+00) using gabions, stone riprap revetment, floodplain benching, native seeding, and rock riffles. The project requires the contractor to provide all equipment, materials, labor, training, warranties, and construction/installation services necessary to complete the described improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis