Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Wheeling (WV) seeks bids for the Wheeling Drainage Ditch Stabilization Project to stabilize and restore the drainage ditch from Northgate Parkway to Dundee Road (station 10+00 to 34+00) using gabions, stone riprap revetment, floodplain benching, native seeding, and rock riffles. The project requires the contractor to provide all equipment, materials, labor, training, warranties, and construction/installation services necessary to complete the described improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of trim vegetation and remove debris along approximately 5,256 LF. Work includes trimming vegetation overhanging the canal within 10 feet of the normal water level, removal of trash and debris along the embankment area to an elevation approximately 10 feet above the normal water level, and removing trash, debris, and vegetative material from the embankment and clearing trash and debris from the drainage ditch channel.
Posted Date
Jan 15, 2026
Due Date
Feb 4, 2026
Release: Jan 15, 2026
Close: Feb 4, 2026
The project consists of trim vegetation and remove debris along approximately 5,256 LF. Work includes trimming vegetation overhanging the canal within 10 feet of the normal water level, removal of trash and debris along the embankment area to an elevation approximately 10 feet above the normal water level, and removing trash, debris, and vegetative material from the embankment and clearing trash and debris from the drainage ditch channel.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
Posted Date
Dec 31, 2025
Due Date
Feb 17, 2026
Release: Dec 31, 2025
Close: Feb 17, 2026
The project includes restoration of stone masonry wingwalls, stabilization of embankment erosion along Rock Run, and replacement of an existing timber pedestrian bridge deck.
AvailableThis RFP is for drainage ditch bank stabilization improvements, including grading, erosion control, stabilization material installation, and vegetation.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
This RFP is for drainage ditch bank stabilization improvements, including grading, erosion control, stabilization material installation, and vegetation.
AvailableThis RFP is for the removal of various obstructions in Henderson County's ditch system.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
This RFP is for the removal of various obstructions in Henderson County's ditch system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →