Project includes but is not limited to: interior renovations to vocational classroom N257 and storage N257B located in building N north and the construction of an adjacent outdoor structure, and associated site improvements. Interior renovations include demolition, cabinetry, finish carpentry, installation of owner furnished demonstration equipment, electrical and plumbing work to connect the demonstration equipment, fire alarm, adjustment to existing electrical, plumbing and mechanical systems and equipment, patching of finishes, and painting. The outdoor structure consists of demolition of existing paving, relocation of utilities, grading, construction of a structural steel structure, reinforced and grouted concrete masonry enclsoure, metal roof, hollow metal doors and frames, reinforced concrete foundations, concrete slab, signage, finishes, and electrical and plumbing work. Site improvements consist of restriping accessible parking stalls and loading zones, site signage, extension of existing storm drain systems, construction of concrete flatwork and equipment pads, installation of owner furnished demonstration equipment on pads and building exterior, removal and replacement of existing fencing and gates, and installation of new fencing.
Available