Summary
Work includes approx 460 SF of Demolition of interior partitions, ceilings, and floor slab in work area. Installation of new partitions, doors, floor slab, and ceilings. Finishing of new spaces with paint, tile, wall coverings and fixtures; 500 SF of Demolition of existing supply and returns to affected rooms. Installation of new supply and return ducting to support new layout. Installation of new ventilation and associated ducting; 430 SF of Removal / relocation of existing fixtures. Re-routing and new wiring of circuits. New fixtures and switches; 200 SF of Removal of existing fixtures. Demolition of existing plumbing. Installation of new piping and fixtures.