Summary
The Coachella Valley Water District (CVWD) is soliciting bids for construction of concrete slope protection on the north bank of the Whitewater River Stormwater Channel upstream of Cook Street, including access driveways, maintenance road, earthwork for groundwater replenishment ponds, water distribution piping, turnout structures, wetland/riparian landscaping, and a new water supply line. The work is part of the Palm Desert Groundwater Replenishment Phase 2 project and Phase 2 Mitigation (Specifications 2020-15 and 2026-29), requiring a Class A license, a 10% bid bond, and attendance at a mandatory pre-bid meeting on 07/29/2026. Bids must be submitted electronically through the PlanetBids portal by 08/26/2026.