Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide architectural, steel, fire suppression, plumbing, mechanical, electrical and site work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide test & evaluation/science & technology (t&e/s&t) program.
Posted Date
Mar 15, 2022
Due Date
Mar 13, 2027
Release: Mar 15, 2022
Close: Mar 13, 2027
Provide test & evaluation/science & technology (t&e/s&t) program.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Addition and renovation at the high school.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
Addition and renovation at the high school.
AvailableBid packages: 3A: concrete - building; 3D: precast concrete hollow core plank (material); 4: masonry; 5A: structural steel (material); 6B: millwork (material); 7A: moisture protection; 7B: liquid applied weather barriers 7C: sprayfoam insulation; 7E: prefinished metal panels; 8A: doors, hardware, frames; 8C: overhead doors and coiling doors; 9B: drywall; 9G: resilient flooring / carpeting; 9E: acoustical; 12B: bleachers; 21: building sprinkler system; 23: HVAC and temp controls; 31A: building demolition; 32A: paving and surfacing; 32B: site fencing; 32C: landscaping; 32D: site irrigation; 33 site utilities.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Bid packages: 3A: concrete - building; 3D: precast concrete hollow core plank (material); 4: masonry; 5A: structural steel (material); 6B: millwork (material); 7A: moisture protection; 7B: liquid applied weather barriers 7C: sprayfoam insulation; 7E: prefinished metal panels; 8A: doors, hardware, frames; 8C: overhead doors and coiling doors; 9B: drywall; 9G: resilient flooring / carpeting; 9E: acoustical; 12B: bleachers; 21: building sprinkler system; 23: HVAC and temp controls; 31A: building demolition; 32A: paving and surfacing; 32B: site fencing; 32C: landscaping; 32D: site irrigation; 33 site utilities.
AvailableWork includes additional 1000 SF contains a split-level metal pan stair, a 3500 lb. TKE Elevator, the RTU, CMU gearing walls, clad in aluminum Longboard siding. EPDM Roof. 500 SF reception area remodeling on Upper Level. 5,000 SF Lower Level interior remodeling with typical interior finishes. o Total square footage of the project is approx. 10,570 S.F. Lower Level +/- 5,200 SF community Room First Floor +/- 500 S.F. reception area.
Posted Date
Dec 25, 2025
Due Date
Feb 11, 2026
Release: Dec 25, 2025
Close: Feb 11, 2026
Work includes additional 1000 SF contains a split-level metal pan stair, a 3500 lb. TKE Elevator, the RTU, CMU gearing walls, clad in aluminum Longboard siding. EPDM Roof. 500 SF reception area remodeling on Upper Level. 5,000 SF Lower Level interior remodeling with typical interior finishes. o Total square footage of the project is approx. 10,570 S.F. Lower Level +/- 5,200 SF community Room First Floor +/- 500 S.F. reception area.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →