Summary
Well No. 2C Pump Column Replacement. For mobilization, demobilization, furnishing all bonds, insurances and submittals; For furnishing and installing new T&C Heavy-Duty column pipe, including the reinstallation of the existing well pump and motor; For furnishing and installing new Flanged Heavy-Duty column pipe, including the reinstallation of the existing well pump and motor; For furnishing and installing new T&C stainless steel column pipe, including the reinstallation of the existing well pump and motor; For well caliper survey, plumbness/deviation testing, alignment (dummy) testing and water quality testing; For the replacement of Buna-N Bearings and 304 S.S. Lineshaft Sleeves