Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Well Collection Line.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes construction of a well collection line system that will connect the existing ground water wells and be built to public drinking water standards includes 1,449 LF of 6" awwa c-900 fusible pvc pipe, including fittings, joint restraints, conductive tracer wire, appurtenances; 109 lf of trenchless construction of 6" waterline, awwa c- 900 fusible pvc pipe, including access pits and appurtenances, complete in place; 8,162 LF of 8" awwa c-900 fusible pvc pipe, including fittings, joint restraints, conductive tracer wire, appurtenances with standard bedding and backfill, complete in place. See attached file.
Posted Date
-
Due Date
Jan 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes construction of a well collection line system that will connect the existing ground water wells and be built to public drinking water standards includes 1,449 LF of 6" awwa c-900 fusible pvc pipe, including fittings, joint restraints, conductive tracer wire, appurtenances; 109 lf of trenchless construction of 6" waterline, awwa c- 900 fusible pvc pipe, including access pits and appurtenances, complete in place; 8,162 LF of 8" awwa c-900 fusible pvc pipe, including fittings, joint restraints, conductive tracer wire, appurtenances with standard bedding and backfill, complete in place. See attached file.
AvailableThe City of Sierra Vista (Arizona) is soliciting sealed bids from qualified general contractors to perform point repairs on the city's main sewer collection system and to replace specified sections of sewer lines. The solicitation is issued as Invitation for Bids (Project ID 2026-IFB-020) and includes a primary solicitation PDF and multiple attachments (bonds, bid terms, specifications, details). Bids are due February 10, 2026 at 2:00 PM Mountain Time (Arizona) and the posting was released January 7, 2026.
Posted Date
Jan 7, 2026
Due Date
Feb 10, 2026
Release: Jan 7, 2026
Close: Feb 10, 2026
The City of Sierra Vista (Arizona) is soliciting sealed bids from qualified general contractors to perform point repairs on the city's main sewer collection system and to replace specified sections of sewer lines. The solicitation is issued as Invitation for Bids (Project ID 2026-IFB-020) and includes a primary solicitation PDF and multiple attachments (bonds, bid terms, specifications, details). Bids are due February 10, 2026 at 2:00 PM Mountain Time (Arizona) and the posting was released January 7, 2026.
AvailableThe Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
The Project includes the following Work for the Collector Well No. 1 Structural/Electrical Upgrades: Reconstruction of the concrete roof to accommodate new access hatches; new membrane roof material; removal of existing electrical conduit and devices impacted by roof reconstruction; provide new 480-volt panelboard, and variable frequency drives for new pumps, new conduit, wiring, and lighting along the roof; and work as specified herein and as shown on the Drawings. The Project includes the following Work for the Collector Well No. 1 Well Reconstruction: Abandonment of one lateral; provide two new 12-inch-diameter laterals; rehabilitation of two existing laterals; pumping tests on Collector Well No. 1 to determine capacity; provide two new pumps and motors sized for the new well capacity; cored opening at top of caisson wall for drain line; connection of sludge lagoon effluent line from Manhole 3 to Collector Well No. 1 caisson; provide new vertical drain line and supports inside the caisson; two test wells.
AvailableRehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Rehabilitation of SW wells 4 and 10 in the southwest wellfield and well 57 well pump inspections, repairs, and replacements for sw wells 4 and 10, well 57, and horse farm well. Building, site, and electrical improvements for sw wells 4 & 10 and well 57.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →