Summary
Bypass project consists of demolition, furnishing, installing, testing and making operational well piping, facility improvements, approximately 50 l. F. Of new 6-inch diameter pvc c-909 water main, approximately 140 l. F. Of new 4-inch diameter pvc sdr-35 pvc sewer main; water meter, chlorine analyzer, enclosure structure, flow meter, reduced pressure backflow device, swing check valve, gate valves, and associated appurtenances; connections to existing water main; connections to existing sewer main; associated paving, trenching and surface restoration; and all other work and materials to complete the contract work.