Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal and replacement of the parking lots.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of miscellaneous bituminous parking lot pavement.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Removal and replacement of miscellaneous bituminous parking lot pavement.
AvailablePremium
Access the largest public sector contact database
The Iowa Department of Administrative Services (DAS) issued an RFP for professional design/ construction services to replace the upper parking lot at Department of Public Safety (DPS) Post 13. The work includes site preparation, grading, paving, drainage improvements, signage, and lighting, and must comply with applicable standards. The solicitation is open on the State of Iowa IMPACS/Jaggaer portal and lists a completion/period-of-performance target of completion by January 15, 2026.
Posted Date
Dec 7, 2025
Due Date
Jan 15, 2026
Release: Dec 7, 2025
Close: Jan 15, 2026
The Iowa Department of Administrative Services (DAS) issued an RFP for professional design/ construction services to replace the upper parking lot at Department of Public Safety (DPS) Post 13. The work includes site preparation, grading, paving, drainage improvements, signage, and lighting, and must comply with applicable standards. The solicitation is open on the State of Iowa IMPACS/Jaggaer portal and lists a completion/period-of-performance target of completion by January 15, 2026.
AvailableContractor shall commence the following scope for Lot 1, Lot 3, Lot 5. Mill 1 ½ inches so not to change the finished elevation when resurfaced; Apply 1 ½" of surface material after the mill; ADA Meter poles will need to stay however lowered to 48 inches in all lots/if removed, they will need to be replaced (contact parking prior to removal of any meter heads); ADA markings must be replaced; Straighten all signage poles in lots ; Re-stripe all traffic control ground paint markings, including all parking stalls; All striping back to previous detail; If bumper blocks are to be removed then reset after the placement of surface; If signage is removed all signage needs to be reinstalled; Replacement of bumper blocks if broken during removal; Clear all unwanted vegetation if present; Provide barricade for complete lot closure; Removal of all capped or not capped meter poles (base treatment as needed to fill the voids). See outside link.
Posted Date
Nov 23, 2025
Due Date
Dec 15, 2025
Release: Nov 23, 2025
Close: Dec 15, 2025
Contractor shall commence the following scope for Lot 1, Lot 3, Lot 5. Mill 1 ½ inches so not to change the finished elevation when resurfaced; Apply 1 ½" of surface material after the mill; ADA Meter poles will need to stay however lowered to 48 inches in all lots/if removed, they will need to be replaced (contact parking prior to removal of any meter heads); ADA markings must be replaced; Straighten all signage poles in lots ; Re-stripe all traffic control ground paint markings, including all parking stalls; All striping back to previous detail; If bumper blocks are to be removed then reset after the placement of surface; If signage is removed all signage needs to be reinstalled; Replacement of bumper blocks if broken during removal; Clear all unwanted vegetation if present; Provide barricade for complete lot closure; Removal of all capped or not capped meter poles (base treatment as needed to fill the voids). See outside link.
AvailableWork includes parking lot striping.
Posted Date
Dec 1, 2025
Due Date
Dec 15, 2025
Release: Dec 1, 2025
Close: Dec 15, 2025
Work includes parking lot striping.