City of Wichita
The City of Wichita, Kansas is soliciting sealed bids for water distribution system and sanitary sewer improvements to serve Cottonwood Creek Estates Phase 2, located south of MacArthur Rd and east of Hoover Rd. Bids are due by 10:00 a.m. on December 5, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Wichita
Provide construction services. Seeding; site clearing; site restoration; 1,870 lf pipe, wl 8"; 15 lf pipe, dicl 8"; 3 ea fire hydrant assembly; 2 ea valve assembly, blowoff 2"; 2 ea valve assembly, 8"; 539 lf pipe, sws 15"; 274 lf pipe, sws 18"; 143 lf pipe, sws 24"; 279 lf pipe, sws 36"; 1 ea pipe, end section 15"; 106 lf fill, sand (flushed & vibrated); 6 ea inlet, curb (type 1a) (l=10' w=3'); 3 ea inlet, backyard (4' dia.); 3 ea inlet, backyard (5' dia.); 1 ea inlet, backyard (6' dia.); 1 ea mh, shallow sws (4'); 20 sy rip-rap, light stone; 6 ea bmp, curb inlet protection; 6 ea bmp, drop inlet protection; 1,875 lf pipe, ss 8"; 5 ea pipe stub, 4"; 15 ea riser assembly 4", vertical. See outside link.
Posted Date
Nov 11, 2025
Due Date
Nov 21, 2025
Release: Nov 11, 2025
City of Wichita
Close: Nov 21, 2025
Provide construction services. Seeding; site clearing; site restoration; 1,870 lf pipe, wl 8"; 15 lf pipe, dicl 8"; 3 ea fire hydrant assembly; 2 ea valve assembly, blowoff 2"; 2 ea valve assembly, 8"; 539 lf pipe, sws 15"; 274 lf pipe, sws 18"; 143 lf pipe, sws 24"; 279 lf pipe, sws 36"; 1 ea pipe, end section 15"; 106 lf fill, sand (flushed & vibrated); 6 ea inlet, curb (type 1a) (l=10' w=3'); 3 ea inlet, backyard (4' dia.); 3 ea inlet, backyard (5' dia.); 1 ea inlet, backyard (6' dia.); 1 ea mh, shallow sws (4'); 20 sy rip-rap, light stone; 6 ea bmp, curb inlet protection; 6 ea bmp, drop inlet protection; 1,875 lf pipe, ss 8"; 5 ea pipe stub, 4"; 15 ea riser assembly 4", vertical. See outside link.
AvailableCity of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Posted Date
Oct 13, 2025
Due Date
Nov 20, 2025
Release: Oct 13, 2025
City of Crystal Lake
Close: Nov 20, 2025
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
AvailableHarris County Mud 43
Phase 1.5 Detention Plan.
Posted Date
Jul 10, 2025
Due Date
Nov 20, 2025
Release: Jul 10, 2025
Harris County Mud 43
Close: Nov 20, 2025
Phase 1.5 Detention Plan.
AvailableCity of Madison
Sauk creek greenway phase 3 & 4.
Posted Date
Oct 14, 2024
Due Date
Dec 18, 2025
Release: Oct 14, 2024
City of Madison
Close: Dec 18, 2025
Sauk creek greenway phase 3 & 4.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis