Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Harris County Mud 43
Phase 1.5 Detention Plan.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Brazoria County Mud 48
Provide phase 1 detention and mass grading. Scope of project: 750,000 CY of detention excavation; 70 LF of 30", 60 LF of 48", 1200 LF of 54" storm sewer pipe and all appurtenances; 562 LF of 8'x6' RCB storm sewer pipe and all appurtenances.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Brazoria County Mud 48
Close: Nov 20, 2025
Provide phase 1 detention and mass grading. Scope of project: 750,000 CY of detention excavation; 70 LF of 30", 60 LF of 48", 1200 LF of 54" storm sewer pipe and all appurtenances; 562 LF of 8'x6' RCB storm sewer pipe and all appurtenances.
AvailableFort Bend County Mud 152
Project Includes Clearing, Grubbing, Demolition, Detention & Mass Grading.
Posted Date
-
Due Date
Nov 21, 2025
Release: -
Fort Bend County Mud 152
Close: Nov 21, 2025
Project Includes Clearing, Grubbing, Demolition, Detention & Mass Grading.
AvailableLago Bello Mud 1a
Project consists of excavation and mass fill and installation of water distribution, sanitary collection, paving and storm sewer system to serve Barrett Crossing Section Two, which is a residential single-family development consisting of 185 lots and approximately 30 acres.
Posted Date
Nov 11, 2025
Due Date
Nov 25, 2025
Release: Nov 11, 2025
Lago Bello Mud 1a
Close: Nov 25, 2025
Project consists of excavation and mass fill and installation of water distribution, sanitary collection, paving and storm sewer system to serve Barrett Crossing Section Two, which is a residential single-family development consisting of 185 lots and approximately 30 acres.
AvailableCity of Foley
Work 1) removal of existing asphalt, curb and gutter, and striping. 2) construction of raised grassed median and slope paved islands. 3) construction of right turn lanes and radius widening at existing driveways. 4) construction of sidewalks. 5) striping, grassing, and pavement markings.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
City of Foley
Close: Dec 3, 2025
Work 1) removal of existing asphalt, curb and gutter, and striping. 2) construction of raised grassed median and slope paved islands. 3) construction of right turn lanes and radius widening at existing driveways. 4) construction of sidewalks. 5) striping, grassing, and pavement markings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis