Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Natural gas lines replacements project - aprox. 1600' MDPE lines & plumbing infrastructure.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project will include the installation of approx. 55,000 LF of 2", 4", and 6" low pressure and intermediate pressure HDPE gas mains, approx. 500 service/meter replacements and associated appurtenances across 18 streets.
Posted Date
Dec 19, 2025
Due Date
Jan 28, 2026
Release: Dec 19, 2025
Close: Jan 28, 2026
The project will include the installation of approx. 55,000 LF of 2", 4", and 6" low pressure and intermediate pressure HDPE gas mains, approx. 500 service/meter replacements and associated appurtenances across 18 streets.
AvailableThe work consists of expanding the wi-fi network throughout the high-rise residential building lee terrace.
Posted Date
Jan 21, 2026
Due Date
Feb 18, 2026
Release: Jan 21, 2026
Close: Feb 18, 2026
The work consists of expanding the wi-fi network throughout the high-rise residential building lee terrace.
AvailableInstallation of approx. 810-LF of 8" PVC sanitary sewer pipe, 140-LF of 6" PVC sanitary sewer services, Seven (7) sewer manholes, eight (8) catch basins, 650-LF of 12" Perforated HDPE pipe, 160-LF of 12" Solid HDPE pipe, 100-LF of 8" subdrain, temporary asphalt trench patching, reclaimed asphalt for new roadway base, preparation of walk and apron areas with new gravel base material, including all appurtenances. The binder and top course hot mix asphalt for the roadway, walks and drives as well as the asphalt berm will be completed by others outside of the Terrace Improvement Project.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
Close: Jan 30, 2026
Installation of approx. 810-LF of 8" PVC sanitary sewer pipe, 140-LF of 6" PVC sanitary sewer services, Seven (7) sewer manholes, eight (8) catch basins, 650-LF of 12" Perforated HDPE pipe, 160-LF of 12" Solid HDPE pipe, 100-LF of 8" subdrain, temporary asphalt trench patching, reclaimed asphalt for new roadway base, preparation of walk and apron areas with new gravel base material, including all appurtenances. The binder and top course hot mix asphalt for the roadway, walks and drives as well as the asphalt berm will be completed by others outside of the Terrace Improvement Project.
AvailableTwo Natural Gas Generac Standby Generators with Installation.
Posted Date
-
Due Date
Feb 17, 2026
Release: -
Close: Feb 17, 2026
Two Natural Gas Generac Standby Generators with Installation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →