Work includes clearing and grubbing, removal of asphalt pavement, all depths 4,602 SY, removal of bridge, removal of guard rail only 744 LF, removal of pipe, 8" and above 193 LF, removal of traffic stripe 5200 LF, unclassified excavation, fm, ah 155 CY, borrow excavation, ah, fme, class b7 14,364 CY, select material for undercuts, contractor furnished, fm 293 CY, solid sodding 100 SY, agricultural limestone 5 Ton, mulch, vegetative mulch 20 Ton, temporary grassing 10 acre, temporary slope drains 292 LF, riprap for erosion control 25 Ton, cold milling of bituminous pavement, all depths 1360 SY. See attached file.
Available