Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
3 EA Demo interiors of existing Wattstopper panels; 3 EA Install retrofit kits in existing enclosures; 1 EA Install/ power network cabinet; 3 EA Pull Wattstopper cable between panels; 2 EA Startup with PLS technician; 20 EA Install retrofit switches; 6 EA Install network power boosters; 1 EA Wattstopper retrofit package.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Generating station unit 8 recycled water cooling system retrofit.
Posted Date
Mar 31, 2025
Due Date
Mar 31, 2026
Release: Mar 31, 2025
Close: Mar 31, 2026
Generating station unit 8 recycled water cooling system retrofit.
AvailableThis project will disconnect existing storm drain outfalls from the piped portion of the No. 1 Canyon Drain (NOCD) system located in Pershing Street between Springwater Avenue and Maple Street and improve stormwater controls with a collective of replacement storm drainage systems and roadway infrastructure repairs. Work will include the installation of a combined 2,037 LF of 12", 18", and 24" corrugated polyethylene pipe (CPEP) connected by 24 pre-cast concrete catch basins of various sizes. The project includes 642 LF of gravel infiltration trenches of differing widths and sizes of perforated CPEP. Four (4) premanufactured water quality filtration catch basins will be installed off-line to treat surface runoff directly prior to release to the new drainage systems. The base project also includes approximately 1,433 LF of 8" ductile iron water main replacement is also included in the work for this project. The NOCD within the subject area is a combination of 36-inch diameter CPEP and 48" corrugated metal pipe (CMP). An alternative additive project scope of work has been identified and may be included in the final contract to remove and replace two (2) approximately 30 LF damaged portions of 36" CPEP and to install a new cured-in-place pipe (CIPP) liner over approximately 1,066 LF of the existing 48" CMP portion of the NOCD.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
The Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.
Posted Date
Dec 30, 2025
Due Date
Mar 31, 2026
Qty 1 ft of main hoist retrofit, main hoist retrofit kit, w/hydraulic motor, p/n f166336-3.
Posted Date
Jan 22, 2026
Due Date
Jan 27, 2026
Release: Jan 22, 2026
Close: Jan 27, 2026
Qty 1 ft of main hoist retrofit, main hoist retrofit kit, w/hydraulic motor, p/n f166336-3.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 5, 2026
This project will disconnect existing storm drain outfalls from the piped portion of the No. 1 Canyon Drain (NOCD) system located in Pershing Street between Springwater Avenue and Maple Street and improve stormwater controls with a collective of replacement storm drainage systems and roadway infrastructure repairs. Work will include the installation of a combined 2,037 LF of 12", 18", and 24" corrugated polyethylene pipe (CPEP) connected by 24 pre-cast concrete catch basins of various sizes. The project includes 642 LF of gravel infiltration trenches of differing widths and sizes of perforated CPEP. Four (4) premanufactured water quality filtration catch basins will be installed off-line to treat surface runoff directly prior to release to the new drainage systems. The base project also includes approximately 1,433 LF of 8" ductile iron water main replacement is also included in the work for this project. The NOCD within the subject area is a combination of 36-inch diameter CPEP and 48" corrugated metal pipe (CMP). An alternative additive project scope of work has been identified and may be included in the final contract to remove and replace two (2) approximately 30 LF damaged portions of 36" CPEP and to install a new cured-in-place pipe (CIPP) liner over approximately 1,066 LF of the existing 48" CMP portion of the NOCD.
AvailableThe Los Angeles Department of Water & Power (LADWP) issued an RFP to retrofit Unit 8 at the Haynes Generating Station by removing the existing once-through ocean cooling system and installing a recycled-water wet cooling system (cooling tower), related water infrastructure, and associated demolition and modernization work. The project requires design, procurement, construction, demolition, and commissioning services to allow Unit 8 to continue operation during and after retrofit; proposals must be submitted electronically through LADWP’s eRSP system. The opportunity is advertised as an RFP with a site visit/pre-proposal meeting scheduled and proposal questions to be submitted by specified deadlines; the procurement was open as of 2025-12-31 with a bid due date of March 31, 2026.