Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Prechlorinate pipe bursting 6,8, and 12" AC waterline with new HDPE / fusible C900; replacement of misc. fire hydrants, valves, and meter reconnects includes 1,850 LF 8" HDPE DIPS DR11/fusible C900 equivalent waterline installed via prechlorinated pipe bursting, 80 LF 8" HDPE DIPS DR11/C-900 PVC water line, all depths, including bends, fittings, installed via open cut complete in place, 1 LS connect to existing 8" A.C. waterline, 7 EA bore long side (single) 1" water service to be constructed of No. 9 Edopure PE meeting ASTM D2737, AWWA C901 and NSF Standards 14 & 16. Complete in place, including required fittings to connect to existing meters all depths. Note: Field verify - Meters are of different manufacturers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes traffic control, 2410 SY pavement removal/disposition, 1260 LF remove existing sanitary sewer pipe, 660 LF remove existing storm sewer pipe, 2390 SY 7" p. C. C. Pavement, 2425 SY fly ash stabilization, 1400 LF subdrain longitudinal, 4" dia, 255 LF storm sewer pipe, 15 inch rcp class iii, 595 LF sanitary sewer pipe, 21" pvc main, 80 VF 60" i. D. Circular sanitary sewer manhole (sw-301). See outside link.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Work includes traffic control, 2410 SY pavement removal/disposition, 1260 LF remove existing sanitary sewer pipe, 660 LF remove existing storm sewer pipe, 2390 SY 7" p. C. C. Pavement, 2425 SY fly ash stabilization, 1400 LF subdrain longitudinal, 4" dia, 255 LF storm sewer pipe, 15 inch rcp class iii, 595 LF sanitary sewer pipe, 21" pvc main, 80 VF 60" i. D. Circular sanitary sewer manhole (sw-301). See outside link.
AvailableProvide paducah levees reconstruction phase 3.
Posted Date
Sep 30, 2025
Due Date
Dec 17, 2025
Release: Sep 30, 2025
Close: Dec 17, 2025
Provide paducah levees reconstruction phase 3.
AvailableProject includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Project includes approx. 5,000 LF of waterline replacement to 8 PVC waterline service connections to the new 8 waterline will extend from the existing meter pits. Valves will be analyzed to allow for phasing of switch-over from the existing waterline to the waterline replacement.
AvailableThe US Army Corps of Engineers, Louisville District (USACE) issued Solicitation W912QR52370251 for the Paducah Levees Reconstruction Phase 3 project to perform levee reconstruction work at 2301 Greenway Trail, Paducah, KY. The procurement is a Total Small Business set-aside under NAICS 237990 and PSC Z2JZ and is structured as work under IDIQ contracts (associated with IDIQ numbers W91237-23-D-0003 through W91237-23-D-0009). Official solicitation details and attachments are hosted on the DoD PIEE/EB portal (login required); SAM.gov shows offers due Dec 17, 2025 and the opportunity is currently active.
Posted Date
Sep 29, 2025
Due Date
Dec 17, 2025
Release: Sep 29, 2025
Close: Dec 17, 2025
The US Army Corps of Engineers, Louisville District (USACE) issued Solicitation W912QR52370251 for the Paducah Levees Reconstruction Phase 3 project to perform levee reconstruction work at 2301 Greenway Trail, Paducah, KY. The procurement is a Total Small Business set-aside under NAICS 237990 and PSC Z2JZ and is structured as work under IDIQ contracts (associated with IDIQ numbers W91237-23-D-0003 through W91237-23-D-0009). Official solicitation details and attachments are hosted on the DoD PIEE/EB portal (login required); SAM.gov shows offers due Dec 17, 2025 and the opportunity is currently active.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis