Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oklahoma Department of Transportation
Work includes clean and prep existing clarifiers and flow splitter. Application of polyurethane liner for a completely waterproof seal of the clarifiers and flow splitter. Perform maintenance on all existing plant equipment, and repair any equipment if needed. Re-start up the plant and verify instrumentation and controls are performing at optimal performance.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Ste. Genevieve
Work includes water treatment plant roof repair.
Posted Date
Nov 19, 2025
Due Date
Dec 10, 2025
Release: Nov 19, 2025
City of Ste. Genevieve
Close: Dec 10, 2025
Work includes water treatment plant roof repair.
AvailableBurnt Cabin Rural Water District
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
Posted Date
Nov 13, 2025
Due Date
Dec 5, 2025
Release: Nov 13, 2025
Burnt Cabin Rural Water District
Close: Dec 5, 2025
Construction of new water treatment plant. Work will consists on a new 40' x 60' steel insulated building complete with foundation (concrete pad and footing) (construction site already prepared but contractor will be responsible for testing of compacted subgrade to ensure suitability of site for construction), all electrical, all HVAC, all required piping and drains for the operation of the plant, all plumbing, lighting, three (3) chemical feed systems for water treatment chemicals, 40,000 gallon steel bolted Clearwell and foundation (site not prepared), supervisory control and data acquisition system (SCADA), two (2) high service pumps, new 8" PVC line to connect new plant to existing raw water line, new 6" PVC treated water line to connect new plant to existing standpipe, all miscellaneous equipment and materials as required.
AvailableMahanoy Township (Water) Authority
Purchase of water treatment plant chemicals for the year 2026
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Mahanoy Township (Water) Authority
Close: Dec 17, 2025
Purchase of water treatment plant chemicals for the year 2026
AvailableCity of Vinton
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
Posted Date
Oct 10, 2025
Due Date
Dec 11, 2025
Release: Oct 10, 2025
City of Vinton
Close: Dec 11, 2025
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis